Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cpp Kkps Urgent Rectification
|
| Description |
Cpp Kkps Urgent Rectification To
The Damaged Portion Of Kunnamkattupathy
Main Canal At Ch 5/750 Km For The Year 2023
24
|
| Organisation | Government of Kerala |
| Tender Id | 2024_Irrig_640795_1 |
|
Reference Number |
IRR/PI/TR/6801/2023_5_6_5/1 |
| Tender Fee | 930 |
| EMD | 10537 |
| Tender Value | - |
| Place | Irrigation Sub Division No III, Chittur |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | January 06, 2024 22:30 |
| End Date |
Expired
15/01/2024
Expired 958 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of dp3 positioner of bov from oem m/s kinetrol india pvt ltd for cpp lakwa
Procurement of dp3 positioner of bov from oem m/s kinetrol india pvt ltd for cpp lakwa
Read moreReplacement of damaged insulation, refractory, rectification of air ducts, gates & dampers and associated works during overhaul activities of units 2 to 4 boilers of rtps (oh-1)
Replacement of damaged insulation, refractory, rectification of air ducts, gates, dampers and associated works during overhaul activities of units 2 to 4 boilers of rtps (oh-1)
Read moreSupply and replacement of position indicators for seven radial gates at bp dam along with rectification floating shaft bevel gear assembly of gate no 2 and 5.
Supply and replacement of position indicators for seven radial gates at bp dam along with rectification floating shaft bevel gear assembly of gate no 2 and 5- scope of work as per tender document.
Read moreStructural rectification comprising dismantling of boom assembly, reconditioning of boom mounting foundation and boom foot eye bores by weld build up, grinding and accurate line boring to restore proper alignment and tolerances, boom cylinder, reasse
Structural rectification comprising dismantling of boom assembly, reconditioning of boom mounting foundation and boom foot eye bores by weld build up, grinding and accurate line boring to restore proper alignment and tolerances, boom cylinder, reasse
Read moreOverhauling of air preheaters and rectification of flue gas ducts from eco outlet to aph inlet, id fans, fd fans, pa fans, scanner air fans, hotwell make up pumps, boiler fill pump and associated works of 3x210 mw, unit-1 to 4 boilers (oh-5)
Overhauling of air preheaters and rectification of flue gas ducts from eco outlet to aph inlet, id fans, fd fans, pa fans, scanner air fans, hotwell make up pumps, boiler fill pump and associated works of 3x210 mw, unit-1 to 4 boilers (oh-5)
Read moreCpp kkps urgent rectification to
Cpp kkps urgent rectification to minor distributory off take from ch 23/700 km of kk pathy main canal for the year 2023 24
Read moreCpp kkps urgent rectification to
Cpp kkps urgent rectification to the parakkal/nerchal branch canal at ch 0/025 km for the year 2023 24
Read moreCpp-kkps- urgent rectification of
Cpp-kkps- urgent rectification of breached portion of field channel offtaking from ch 0/900 km of vadakkepirivu branch canal at ch 0/020km of field channel
Read moreNabard-ridf xxix (2023-24)-cpp-kkps rectification
Nabard-ridf xxix 2023-24 -cpp-kkps rectification works to kunnamkattupathy main canal
Read moreCpp-kkps-monsoon preparedness
Cpp-kkps-monsoon&#x0d preparedness-engaging man mazdoor for&#x0d cutting trees and branches at different locations&#x0d of varoius canals under kunnamkattupathy&#x0d system - for the year 2024-25-
Read moreof your Industry type