Tender Details

Particulars Details
Title
In Year 2024 25 Special Repair Work Of Bangra Jagammanpur To Jamrehi Abbal Link Road.
Description
In Year 2024 25 Special Repair Work Of Bangra Jagammanpur To Jamrehi Abbal Link Road.
Organisation Chief Engineer Jhansi Zone PWD Jhansi UP | State Govt. and UT
Tender Id 2025_CEJNS_993947_1
Reference
Number
2306/10A date 31.12.2024
Tender Fee 2950
EMD 3.1 Lakh
Tender Value
Place ORAI
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1759740
Start Date January 17, 2025 17:30
End Date

25/01/2025 ( Expired 118 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)

Read more
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre

Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre

Read more
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026

E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026

Read more
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise