Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 16 (Sixteen) Nos. Isolation Stopping For Proposed Panel Kt 48 (Top) In Kenda Top Seam At Kunustoria Colliery Under Kunustoria Area
|
| Description |
Construction Of 16 (Sixteen) Nos. Isolation Stopping For Proposed Panel Kt 48 (Top) In Kenda Top Seam At Kunustoria Colliery Under Kunustoria Area
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_303250_1 |
|
Reference Number |
ECL/KNT/CMC/NIT/23-24/351, Dt. 28.02.2024 |
| Tender Fee | 0 |
| EMD | 52400 |
| Tender Value | |
| Place | Kunustoria Colliery, Kunustoria Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=314132 |
| Start Date | March 02, 2024 22:30 |
| End Date |
Expired
12/03/2024
Expired 818 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction one ventilation stopping with door and plastering with hollering 19 nos old ventilation stoppings in s p combined seam under kumardhubi colliery.
Construction one ventilation stopping with door and plastering with hollering 19 nos old ventilation stoppings in s p combined seam under kumardhubi colliery.
Read moreConstruction of air crossing /foot bridge at - 3e/l12 junction in m.s. seam haulage line of lakhimata colliery.
Construction of air crossing /foot bridge at - 3e/l12 junction in m.s. seam haulage line of lakhimata colliery.
Read moreAnnual maintenance contract of 01 nos orion make 50 mt capacity electronic road weighbridge, model oew,ultima, s.no.013p-1303 installed at check post of ara colliery under kuju area for a period of 01 year.
Annual maintenance contract of 01 nos orion make 50 mt capacity electronic road weighbridge, model oew,ultima, s.no.013p-1303 installed at check post of ara colliery under kuju area for a period of 01 year.
Read moreInvitation of bids for empanelment in the base panel for digital advertisement services

 invitation of bids from micro/small startups/msme entities for empanelment in the base panel for digital advertisement services (at base rate) under the digital advertisement policy, 2023
Read moreEngagement of tractor mounted water tanker (01 nos. tanker) on hire for supply of drinking water at lalmatia colony rehab site (azad grp) under rajmahal area for 365 days.
Engagement of tractor mounted water tanker (01 nos. tanker) on hire for supply of drinking water at lalmatia colony rehab site (azad grp) under rajmahal area for 365 days.
Read moreEngagement of 05 nos. tractors mounted water tanker for supplying of drinking water and misc. purpose at bhorai rehab site, bhorai (five tola) and dakaita rehab site under rajmahal area.
Engagement of 05 nos. tractors mounted water tanker for supplying of drinking water and misc. purpose at bhorai rehab site, bhorai (five tola) and dakaita rehab site under rajmahal area.
Read moreNccf lucknow branch has invited the offer rates for proposed various works of procurement of it router work, providing and installation of ms shed in ramp area (phase-i and phase-ii) at aiia, new delhi
Nccf lucknow branch has invited the offer rates for proposed various works of procurement of it router work, providing and installation of ms shed in ramp area (phase-i and phase-ii) at aiia, new delhi
Read moreDesign supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Read moreProposed construction of double storied new school building for anandabazar h.s. school at anandabazar, kanchanpur, north tripura under state plan for spa tied during the year 2014 2015 sh building portion including internal water supply and san
Proposed construction of double storied new school building for anandabazar h.s. school at anandabazar, kanchanpur, north tripura under state plan for spa tied during the year 2014 2015 sh building portion including internal water supply and san
Read moreConstruction of rain harvesting structures for recharging of various water supply irrigation schemes and to protect the soil from scouring in nadaun area in tehsil nadaun distt. hamirpur under state disaster mitigation fund near lwss bara choru
Construction of rain harvesting structures for recharging of various water supply irrigation schemes and to protect the soil from scouring in nadaun area in tehsil nadaun distt. hamirpur under state disaster mitigation fund near lwss bara choru
Read moreof your Industry type