Tender Details

Particulars Details
Title
Nhidcl/Meghalaya/Nh 51 /Tura Bypass/2025
Description
Construction To 2 Lane With Paved Shoulder Of Tura Bypass Ing From Existing Km 57.500 Of Nh 127 B And Ending At Existing Km 108.750 Of Nh 217 (Length 29.030 Km) On Hybrid Annuity Mode In The State Of Meghalaya
Organisation National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department
Tender Id 2025_NHIDC_869769_1
Reference
Number
NHIDCL/Meghalaya/NH-51 /Tura Bypass/2025
Tender Fee 70800
EMD 5.2 Crore
Tender Value
Place Meghalaya
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=914326

Start Date September 01, 2025 16:30
End Date
Expired 24/09/2025

Expired 285 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Nhidcl/meghalaya/nh-51/ tura bypass/2025

Construction to 2-lane with paved shoulder of tura bypass ing from existing km&#x0d 57.500 of nh-127b and ending at existing km 108.750 of nh- 217 (length-29.030 km) on hybrid annuity mode in the state of meghalaya.

Read more
Nhidcl/meghalaya/tura bypass/ie/2025

Ie services for construction to 2-lane with paved shoulder of tura bypass between existing km 57.500 of nh-127b (design chainage km 0.000) and km 108.750 of nh-217 (design chainage km 29.030) (length 29.030km) on hybrid annuity mode

Read more
Rfp for construction of deoria bypass from existing km. 27.140 to existing km. 46.780 (design km. 49.109) on nh727a (design length 21.969 km.) to four lane with paved shoulder configuration under hybrid annuity mode (ham) in the state of up.

Rfp for construction of deoria bypass from existing km. 27.140 to existing km. 46.780 (design km. 49.109) on nh727a (design length 21.969 km.) to four lane with paved shoulder configuration under hybrid annuity mode (ham) in the state of up.

Read more
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Read more
Construction of bypass to narsapuram town on nh 216 of 2 lane with paved shoulder configuration ing from existing ch. km 126.100 of nh 216 old nh 214a and ending at km 10.814 existing chainage of nh 216 in the state of andhra pradesh

Construction of bypass to narsapuram town on nh 216 of 2 lane with paved shoulder configuration ing from existing ch. km 126.100 of nh 216 old nh 214a and ending at km 10.814 existing chainage of nh 216 in the state of andhra pradesh

Read more
Independent engineer services for construction of salempur bypass to four lane with paved shoulder configuration from km 64.000 of nh-727a to km 61.500 of nh-727b ,design length of 14.700 km under hybrid annuity mode (ham) in the state of up

Independent engineer services for construction of salempur bypass to four lane with paved shoulder configuration from km 64.000 of nh-727a to km 61.500 of nh-727b ,design length of 14.700 km under hybrid annuity mode (ham) in the state of up

Read more
Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode

Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode

Read more
Construction of rewa bypass as 4-lane with paved shoulder along with service road s from the ratahara chowk to chorhata chowk road section of nh-30 design length 19.20 km in the state of madhya pradesh on hybrid annuity mode (ham)

Construction of rewa bypass as 4-lane with paved shoulder along with service road s from the ratahara chowk to chorhata chowk road section of nh-30 design length 19.20 km in the state of madhya pradesh on hybrid annuity mode (ham)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise