Tender Details
Particulars | Details |
---|---|
Title |
Execution Of 3 Nos Of Road Under Bridges (Rub) With Covered Approaches And 10 Nos Of Road Over Bridges (Rob) And Other Related Miscellaneous Work Between Km 0.00 (Rewa) To Km 88.75 (Sidhi) Of Rewa Sidhi New Bg Line Rail Project
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72895538 |
Reference Number |
DYCEC1REWA-01-2024 |
Tender Fee | 0 |
EMD | 50.52 Lakh |
Tender Value | |
Place | Jabalpur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022024/72895538/viewNitPdf_4442505.pdf |
Start Date | January 05, 2024 18:23 |
End Date |
05/02/2024 ( Expired 475 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Construction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreDesign and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Read moreProject management consultancy services for construction of proposed rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway station along mr-10 road indore
Project management consultancy services for construction of proposed rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway station along mr-10 road indore
Read moreProviding and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 0.00 to km 57.00 at different stretches on road jauljibi-munsiyari and tack coat with bitumen emulsion over existing surface, correction work with
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 0.00 to km 57.00 at different stretches on road jauljibi-munsiyari and tack coat with bitumen emulsion over existing surface, correction work with
Read moreCivil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Civil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Read moreConstruction of h/l bridges 15.56 m long over khui khera drain x-ing fazilka to malout road (mdr-40) at rd 37200 including its approaches, road di and protection work in district fazilka (under head 5054 rb-10)
Construction of h/l bridges 15.56 m long over khui khera drain x-ing fazilka to malout road (mdr-40) at rd 37200 including its approaches, road di and protection work in district fazilka (under head 5054 rb-10)
Read moreConstruction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreof your Industry type