Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Lane From Nazir Ahmad Mir To Lo Ali Mohd At Avendgund
|
| Description |
Construction Of Lane From Nazir Ahmad Mir To Lo Ali Mohd At Avendgund
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_231376_33 |
|
Reference Number |
e- NIT No. 133/2023-24 Dated 27-09-2023 |
| Tender Fee | 200 |
| EMD | 2000 |
| Tender Value | |
| Place | Executive Engineer REW Pulwama |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | September 27, 2023 23:30 |
| End Date |
Expired
05/10/2023
Expired 1009 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Construction work involving the raising of the road level and the construction of drains and a cc surface in ward 83 fakhruddin ali ahmed nagar spanning the stretch from the chicken meat shop near kach bridge to the t-point/jhallu
Read moreConstruction of cc road from rahat wali ghati to charbhuja ji temple at revenue village dhikali. 2603
Construction of cc road from rahat wali ghati to charbhuja ji temple at revenue village dhikali. 2603
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreRoad construction work from karvarikalan to bandarpura village
Road construction work from karvarikalan to bandarpura village
Read moreConstruction of interlocking road from kashmir ji house to shyamveer singh ji house at vill. -kharit, block- jasrana distt. firozabad.
Construction of interlocking road from kashmir ji house to shyamveer singh ji house at vill. -kharit, block- jasrana distt. firozabad.
Read moreConstruction of drainage from pundalik dessai house to rudresh mapari house including cross drainage at gaowada in v.p. assolda assolda.
Construction of drainage from pundalik dessai house to rudresh mapari house including cross drainage at gaowada in v.p. assolda assolda.
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConstruction of gutter and cross drainage from nr. harshal naik at betkador assolda in v.p. assolda
Construction of gutter and cross drainage from nr. harshal naik at betkador assolda in v.p. assolda
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreof your Industry type