For The Work Of Business Plan 2023 24 For Installation Of Additional Transformer Due To Overloading Of Transformer Work Under Eudd Iii, Meerut.
|
| Description |
For The Work Of Business Plan 2023 24 For Installation Of Additional Transformer Due To Overloading Of Transformer Work Under Eudd Iii, Meerut.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNL_839485_1 |
|
Reference Number |
E-Tender No.-144/EUDC/MEERUT/2023-2024 |
| Tender Fee | 1180 |
| EMD | 8000 |
| Tender Value | - |
| Place | SE EUDC MEERUT |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 18, 2023 14:30 |
| End Date |
Expired
25/09/2023
Expired 1113 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
De-paralleling of 2nos. 80mva ptrs and erection of new 33kv pt set to 33kv bus section-iii and erection of 100kva station transformer at 132kv ss asifnagar in omc/metro-cetnral circle/metro zone-i
De-paralleling of 2nos. 80mva ptrs and erection of new 33kv pt set to 33kv bus section-iii and erection of 100kva station transformer at 132kv ss asifnagar in omc/metro-cetnral circle/metro zone-i
Read moreTurnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, begusarai, darbhanga, saharsa, kishanganj and purnea under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.
Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, begusarai, darbhanga, saharsa, kishanganj and purnea under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreSupply, erection, testing and commissioning of the following works on turnkey basis in narayanpet district under makthal-narayanpet-kodangal lift irrigation scheme(package-3) i) 220/11kv liss at jayamma cheruvu, perapalla(v), narayanpet(m). ii) 220kv tmdc line from existing 220/132kv kosigiss to proposed 220/11kvss at jayamma cheruvu ss (27.298km). iii) 2nos. 220kv bays at 220/132kv ss kosigi. iv) 1no.132/11kv transformer bay at existing 132/11kv panchadevpahad ss
Supply, erection, testing and commissioning of the following works on turnkey basis in narayanpet district under makthal-narayanpet-kodangal lift irrigation scheme(package-3) i) 220/11kv liss at jayamma cheruvu, perapalla(v), narayanpet(m). ii) 220kv tmdc line from existing 220/132kv kosigiss to proposed 220/11kvss at jayamma cheruvu ss (27.298km). iii) 2nos. 220kv bays at 220/132kv ss kosigi. iv) 1no.132/11kv transformer bay at existing 132/11kv panchadevpahad ss
Read moreFor the work of additional business plan 2023-24 for installation of additional transformer due to overloading transformer work under eudd-ii, meerut.
For the work of additional business plan 2023-24 for installation of additional transformer due to overloading transformer work under eudd-ii, meerut.
Read moreFor the work of business plan 2023-24 nagar nigam for installation of additional transformer due to overloading of transformer work under eudd-iii, meerut.
For the work of business plan 2023-24 nagar nigam for installation of additional transformer due to overloading of transformer work under eudd-iii, meerut.
Read moreFor the work of business plan 2023-24 for installation of additional transformer due to overloading transformer work under eudd-ii, meerut.
For the work of business plan 2023-24 for installation of additional transformer due to overloading transformer work under eudd-ii, meerut.
Read moreFor the work of business plan 2023-24 for installation of additional transformer due to overloading of transformer and existing transformer capacity enhancement work under eudd-iii, meerut.
For the work of business plan 2023-24 for installation of additional transformer due to overloading of transformer and existing transformer capacity enhancement work under eudd-iii, meerut.
Read moreFor the work of business plan 2024-25 to installation of 23 no. additional 250 kva transformer due to overloading of 400 kva and 02 no. 100 kv additional transformer under eudd-iv, meerut.
For the work of business plan 2024-25 to installation of 23 no. additional 250 kva transformer due to overloading of 400 kva and 02 no. 100 kv additional transformer under eudd-iv, meerut.
Read moreFor the work of business plan 2023-24 (nagar nigam) to installation of 08 no. additional 250 kva transformer due to overloading of 400 kva transformer work under eudd-iv, meerut.
For the work of business plan 2023-24 (nagar nigam) to installation of 08 no. additional 250 kva transformer due to overloading of 400 kva transformer work under eudd-iv, meerut.
Read moreof your Industry type