Tender Details

Particulars Details
Title
For The Work Of Business Plan 2023 24 For Installation Of Additional Transformer Due To Overloading Of Transformer Work Under Eudd Iii, Meerut.
Description
For The Work Of Business Plan 2023 24 For Installation Of Additional Transformer Due To Overloading Of Transformer Work Under Eudd Iii, Meerut.
Organisation Government of Uttar Pradesh
Tender Id 2023_PVVNL_839485_1
Reference
Number
E-Tender No.-144/EUDC/MEERUT/2023-2024
Tender Fee 1180
EMD 8000
Tender Value -
Place SE EUDC MEERUT
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date September 18, 2023 14:30
End Date
Expired 25/09/2023

Expired 1113 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
De-paralleling of 2nos. 80mva ptrs and erection of new 33kv pt set to 33kv bus section-iii and erection of 100kva station transformer at 132kv ss asifnagar in omc/metro-cetnral circle/metro zone-i

De-paralleling of 2nos. 80mva ptrs and erection of new 33kv pt set to 33kv bus section-iii and erection of 100kva station transformer at 132kv ss asifnagar in omc/metro-cetnral circle/metro zone-i

Read more
Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, begusarai, darbhanga, saharsa, kishanganj and purnea under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.

Turnkey contract for installation of 14 nos. of additional 5 mva departmental power transformer along with associated 33 kv & 11 kv protection system and 11 kv bay at different power sub station in electric supply circle, begusarai, darbhanga, saharsa, kishanganj and purnea under o&m capital head/ internal resource fund (irf), o&m department, nbpdcl.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Supply, erection, testing and commissioning of the following works on turnkey basis in narayanpet district under makthal-narayanpet-kodangal lift irrigation scheme(package-3) i) 220/11kv liss at jayamma cheruvu, perapalla(v), narayanpet(m). ii) 220kv tmdc line from existing 220/132kv kosigiss to proposed 220/11kvss at jayamma cheruvu ss (27.298km). iii) 2nos. 220kv bays at 220/132kv ss kosigi. iv) 1no.132/11kv transformer bay at existing 132/11kv panchadevpahad ss

Supply, erection, testing and commissioning of the following works on turnkey basis in narayanpet district under makthal-narayanpet-kodangal lift irrigation scheme(package-3) i) 220/11kv liss at jayamma cheruvu, perapalla(v), narayanpet(m). ii) 220kv tmdc line from existing 220/132kv kosigiss to proposed 220/11kvss at jayamma cheruvu ss (27.298km). iii) 2nos. 220kv bays at 220/132kv ss kosigi. iv) 1no.132/11kv transformer bay at existing 132/11kv panchadevpahad ss

Read more
For the work of additional business plan 2023-24 for installation of additional transformer due to overloading transformer work under eudd-ii, meerut.

For the work of additional business plan 2023-24 for installation of additional transformer due to overloading transformer work under eudd-ii, meerut.

Read more
For the work of business plan 2023-24 nagar nigam for installation of additional transformer due to overloading of transformer work under eudd-iii, meerut.

For the work of business plan 2023-24 nagar nigam for installation of additional transformer due to overloading of transformer work under eudd-iii, meerut.

Read more
For the work of business plan 2023-24 for installation of additional transformer due to overloading transformer work under eudd-ii, meerut.

For the work of business plan 2023-24 for installation of additional transformer due to overloading transformer work under eudd-ii, meerut.

Read more
For the work of business plan 2023-24 for installation of additional transformer due to overloading of transformer and existing transformer capacity enhancement work under eudd-iii, meerut.

For the work of business plan 2023-24 for installation of additional transformer due to overloading of transformer and existing transformer capacity enhancement work under eudd-iii, meerut.

Read more
For the work of business plan 2024-25 to installation of 23 no. additional 250 kva transformer due to overloading of 400 kva and 02 no. 100 kv additional transformer under eudd-iv, meerut.

For the work of business plan 2024-25 to installation of 23 no. additional 250 kva transformer due to overloading of 400 kva and 02 no. 100 kv additional transformer under eudd-iv, meerut.

Read more
For the work of business plan 2023-24 (nagar nigam) to installation of 08 no. additional 250 kva transformer due to overloading of 400 kva transformer work under eudd-iv, meerut.

For the work of business plan 2023-24 (nagar nigam) to installation of 08 no. additional 250 kva transformer due to overloading of 400 kva transformer work under eudd-iv, meerut.

Read more
Click Here to Download Dockets
of your Industry type