Tender Details
Particulars | Details |
---|---|
Title |
Piplod Depot: Manufacturing, Supply And Stacking Of 50 Mm Size Machine Crushed Track Ballast At Depot And Loading The Same Into Hopper. (1,52,687 Cum).
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79299771 |
Reference Number |
RTM-2024-25-130 |
Tender Fee | 0 |
EMD | 8.17 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79299771/viewNitPdf_4820217.pdf |
Start Date | January 04, 2025 00:33 |
End Date |
27/01/2025 ( Expired 85 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply and stacking of crushed stone aggregates of various size and stone dust between km 38.00 to 45.79 on rrk road for gsb works and km 26.00 on rrk road for wmm works and at km 76.00 on rrk for dbm and bc works between km 38.00 to km 45.79 under 1
Supply and stacking of crushed stone aggregates of various size and stone dust between km 38.00 to 45.79 on rrk road for gsb works and km 26.00 on rrk road for wmm works and at km 76.00 on rrk for dbm and bc works between km 38.00 to km 45.79 under 1
Read moreSupply and installation of complete air compressor alongwith necessary fitting etc. at track hopper of chp-210 mw atps mppgcl chachai .
Supply and installation of complete air compressor alongwith necessary fitting etc. at track hopper of chp-210 mw atps mppgcl chachai .
Read moreLoading of different raw materials, into company&rsquos dumper and unloading the same at the specified areas as per the instruction of rm department and as required by production department
Loading of different raw materials, into company&rsquos dumper and unloading the same at the specified areas as per the instruction of rm department and as required by production department
Read moreAnnual work contract for cleaning of accumulated fly ash dust around the silo of phi phii phiii silo area roadsopen space near silo by hiring the jcb machine with sel and operator loading into the trucksdispose off into ash sump at 4x210mw silo
Annual work contract for cleaning of accumulated fly ash dust around the silo of phi phii phiii silo area roadsopen space near silo by hiring the jcb machine with sel and operator loading into the trucksdispose off into ash sump at 4x210mw silo
Read moreSupplying and stacking of 65 mm machine crushed stone ballast for mgr track at ntpc kaniha
Read more
Procurement and running out of 50mm machine crushed ballast for main line at tp816, 817, 819, 820 km and tp 822 to 831 for maintenance of ghoradongri - sarni railway siding at stps, sarni.
Procurement and running out of 50mm machine crushed ballast for main line at tp816, 817, 819, 820 km and tp 822 to 831 for maintenance of ghoradongri - sarni railway siding at stps, sarni.
Read moreSupply of precast concrete main hole cover with frame as per is-12592-2002 extra heavy duty with center hole 100 mm dia in size including transportation work to central store thatipur, gwalior with loading and unloding and stacking complete. size 900
Supply of precast concrete main hole cover with frame as per is-12592-2002 extra heavy duty with center hole 100 mm dia in size including transportation work to central store thatipur, gwalior with loading and unloding and stacking complete. size 900
Read moreSupply, installation, testing and commissioning of 02 nos. 24 v/ 50 a d.c. float cum boost battery charger
Supply, installation, testing and commissioning of 02 nos. 24 v/ 50 a d.c. float cum boost battery charger at nirgajini and chitaura power house, under egd muzaffarnagar.
Read moreSupply and stacking of crushed stone aggregates of sizes 6 pt 7 mm at km 24 pt 75 hmp site on lachen kalep road for bc 40 mm including correction work for resurfacing works 2025 26 on road chungthang lachen from km 19 pt 700 to km 27 pt 800 under 86
Supply and stacking of crushed stone aggregates of sizes 6 pt 7 mm at km 24 pt 75 hmp site on lachen kalep road for bc 40 mm including correction work for resurfacing works 2025 26 on road chungthang lachen from km 19 pt 700 to km 27 pt 800 under 86
Read moreSupply and stacking of different size materials for wbm work bet km 12.00 to km 21.048 on y-jn-nelya rd and supply and stacking of different size materials at km 3.5 km hmp site on s- k rd under 117 rcc/763 brtf/project vartak in arunachal pradesh
Supply and stacking of different size materials for wbm work bet km 12.00 to km 21.048 on y-jn-nelya rd and supply and stacking of different size materials at km 3.5 km hmp site on s- k rd under 117 rcc/763 brtf/project vartak in arunachal pradesh
Read moreof your Industry type