Tender Details

Particulars Details
Title
Completion Of Ntr Sports Complex Of Kuppam, Chittoor District, Andhra Pradesh
Description
Public Health Circle, Nellore Completion Of Ntr Sports Complex Of Kuppam, Chittoor District, Andhra Pradesh
Organisation Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 11800
EMD 16.88 Lakh
Tender Value
Place AP
Link

AAAAAAAAAA

Login to view
Start Date May 24, 2025 16:30
End Date

09/06/2025 ( 1 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh

Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh

Read more
One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode

One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode

Read more
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25

One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25

Read more
One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode

Read more
One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode

One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode

Read more
Const. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode

Const. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode

Read more
Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh

Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh

Read more
Development operation and mmlp park mmlp at sri satya sai anantapur district in andhra pradesh through ppp on dbfot basis.

Development operation and mmlp park mmlp at sri satya sai anantapur district in andhra pradesh through ppp on dbfot basis.

Read more
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.

Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.

Read more
Short term maintenance to kanaka durga flyover from km. 0/000( 269/900) to km. 5/122 (275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh

Short term maintenance to kanaka durga lyover from km.0/000( 269/900) to km.5/122(275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise