Tender Details
Particulars | Details |
---|---|
Title |
Completion Of Ntr Sports Complex Of Kuppam, Chittoor District, Andhra Pradesh
|
Description |
Public Health Circle, Nellore Completion Of Ntr Sports Complex Of Kuppam, Chittoor District, Andhra Pradesh
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 11800 |
EMD | 16.88 Lakh |
Tender Value | |
Place | AP |
Link |
AAAAAAAAAA Login to view |
Start Date | May 24, 2025 16:30 |
End Date |
09/06/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreOne time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode
One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode
Read moreOne time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
Read moreOne time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode
One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode
Read moreOne time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode
One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode
Read moreConst. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Const. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Read moreConstruction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh
Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh
Read moreDevelopment operation and mmlp park mmlp at sri satya sai anantapur district in andhra pradesh through ppp on dbfot basis.
Development operation and mmlp park mmlp at sri satya sai anantapur district in andhra pradesh through ppp on dbfot basis.
Read moreRehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Read moreShort term maintenance to kanaka durga flyover from km. 0/000( 269/900) to km. 5/122 (275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh
Short term maintenance to kanaka durga lyover from km.0/000( 269/900) to km.5/122(275/022), missing link of nh-9 (new nh-65) i.e ., connecting nh-5 and nh-9 in (randb) nh division, vijayawada in the state of andhra pradesh
Read moreof your Industry type