Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit V Reconditioning Repairing Of 350 Nb 2500spl Cl Wc 9 Main Steam Stop Valve M O Without Actuator Released From Unit V Boiler
|
Description |
Ttps Mech Ii Bm Unit V Reconditioning Repairing Of 350 Nb 2500spl Cl Wc 9 Main Steam Stop Valve M O Without Actuator Released From Unit V Boiler
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_369526_1 |
Reference Number |
CE/TTPS/SE/M.II/No.316/2023-24 |
Tender Fee | 0 |
EMD | 16900 |
Tender Value | |
Place | O/o SE / M-II / TTPS |
Link | https://tntenders.gov.in |
Start Date | September 13, 2023 19:30 |
End Date |
03/10/2023 ( Expired 593 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ktps-v-bm-insitu reconditioning refurbishment of the main steam stop valves size 14 class 2500 spl gate valve (tag nos ms-1 and ms2) during unit9 annual overhaul.
Ktps-v-bm-insitu reconditioning refurbishment of the main steam stop valves size 14 class 2500 spl gate valve (tag nos ms-1 and ms2) during unit9 annual overhaul-reg
Read moreKtps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026-reg
Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026
Read moreTtps mechii bm unt v reconditioning of coal nozzle and matching with coal nozzle tips released from unit v boiler during 2025 2026 overhaul
Ttps mechii bm unt v reconditioning of coal nozzle and matching with coal nozzle tips released from unit v boiler during 2025 2026 overhaul
Read moreTtps mechii bm full reconditioning of worn out coal nozzle tips released from unit v boiler during 2025 2026 overhaul
Ttps mechii bm full reconditioning of worn out coal nozzle tips released from unit v boiler during 2025 2026 overhaul
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii
Ttps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii
Read moreTtps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Ttps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Read moreTtps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Ttps mech ii bm unit i ii iii boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of
Read moreTtps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026
Ttps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026
Read moreof your Industry type