Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Sbild Thiruvananthapuram Water Proofing Treatment On Terrace Floor Of Hostel Block
|
Description |
Sbild Thiruvananthapuram Water Proofing Treatment On Terrace Floor Of Hostel Block
|
Organisation | State Bank of India | Public Sector Banks |
Tender Id | SP1-T-H-23082024-7176 |
Reference Number |
THI/LHO/2024/13 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | LHO,Thiruvananthapuram |
Link | https://bank.sbi/web/sbi-in-the-news/procurement-news |
Start Date | August 23, 2024 16:00 |
End Date |
06/09/2024 ( Expired 287 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreThree-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Read moreRequest for proposal for selection of a private partner to develop student hostels vaigai hostel, sarayu hostel at iit madras on ppp mode
Request for proposal for selection of a private partner to develop student hostels vaigai hostel, sarayu hostel at iit madras on ppp mode
Read moreEpc package for development of 10mld water treatment plant package for
Epc package for development of 10mld water treatment plant package forngel green hydrogen hub at pudimadaka anakapalli district andhra pradesh
Read moreEstablishment of 3 mld desalination plant based on sea water reverse osmosis at v.o.chidambaranar port and operation and maintenance for 5 years on dbo mode
Establishment of 3 mld desalination plant based on sea water reverse osmosis at v.o.chidambaranar port and operation and maintenance for 5 years on dbo mode
Read moreRepair and roof treatment wc stacks, rwp, plastering, sunken treatment etc in md accn and repair to parapets, shafts, sunken floor of dbn mess, auditorium, vtc, ib, jsi, pepps school etc under age b/r-ii at ge gurdaspur
Repair and roof treatment wc stacks, rwp, plastering, sunken treatment etc in md accn and repair to parapets, shafts, sunken floor of dbn mess, auditorium, vtc, ib, jsi, pepps school etc under age b/r-ii at ge gurdaspur
Read moreInstallation of faecal sludge and treatment plant of 6 kld capacity based on bio digester aided constructed wetland (bac) technology at nabadwip block, nadia
Installation of faecal sludge and treatment plant of 6 kld capacity based on bio digester aided constructed wetland (bac) technology at nabadwip block, nadia
Read moreInstallation of faecal sludge and treatment plant of 10 kld capacity based on bio digester aided constructed wetland (bac) technology at karimpur-ii block, nadia
Installation of faecal sludge and treatment plant of 10 kld capacity based on bio digester aided constructed wetland (bac) technology at karimpur-ii block, nadia
Read moreof your Industry type