Tender Details
Particulars | Details |
---|---|
Title |
Stainless Steel Ss 17 4 Ph Round Bars Of Diameter 100mm And Length 200mm,Stainless Steel Ss 17 4 Ph
|
Description |
|
Organisation | Department of Atomic Energy | PMO |
Tender Id | GEM/2023/B/4177381 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://gem.gov.in/ |
Start Date | November 09, 2023 23:28 |
End Date |
21/11/2023 ( Expired 561 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Machined stainless steel rods of dia 152+ 1.0/-0 mm x 1020+ 10/-0 mm length as per the specificatio
Read more
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreIe service for construction of 4-lane of dewas-ujjain section of nh752d from design km 0.000 to 19.733 including ujjain bypass from design km 19.733 to 26.900 (parti) and dewas bypass from design km 0.000 to 14.520 (partii) total length of 41.42 km
Ie service for construction of 4-lane of dewas-ujjain section of nh752d from design km 0.000 to 19.733 including ujjain bypass from design km 19.733 to 26.900 (parti) and dewas bypass from design km 0.000 to 14.520 (partii) total length of 41.42 km
Read moreInternal electrification in b type shop 05 nos c type shop 12 nos in grain and sfof 17 nos bulk head led light extension of lt line by sf of steel tubular pole 4 nos sf of led street light 04 nos pole painting and cabling etc work at nmy charra
Internal electrification in b type shop 05 nos c type shop 12 nos in grain and sfof 17 nos bulk head led light extension of lt line by sf of steel tubular pole 4 nos sf of led street light 04 nos pole painting and cabling etc work at nmy charra
Read moreWork contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Work contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Read moreRepair of roof treatment and wooden/steel joinery including ss jali, glass panes and other allied works in certain building in the aor of age b/r-i under ge narangi.
Repair of roof treatment and wooden/steel joinery including ss jali, glass panes and other allied works in certain building in the aor of age b/r-i under ge narangi.
Read moreof your Industry type