Tender Details
Particulars | Details |
---|---|
Title |
Appointment Of Contractor For Implementation Of Multi Modal Integration Facilities At 6 Metro Stations Of Mumbai Metro Line 5 Phase 1 Balkum Naka To Dhamankar Naka
|
Description |
Appointment Of Contractor For Implementation Of Multi Modal Integration Facilities At 6 Metro Stations Of Mumbai Metro Line 5 Phase 1 Balkum Naka To Dhamankar Naka
|
Organisation | Mumbai Metropolitan Region Development Authority | State Govt. and UT |
Tender Id | 2024_MMRDA_1049498_1 |
Reference Number |
TnC/MMI/ML5/WORK/PH1/2024 |
Tender Fee | 35400 |
EMD | 5 Lakh |
Tender Value | |
Place | BALKUM NAKA |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1832339 |
Start Date | July 08, 2024 23:35 |
End Date |
08/08/2024 ( Expired 290 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreAppointment of consulting firm for the role of independent engineer for commercial utilization, operation and maintenance of multi-modal transport hub at sabarmati, ahmedabad
Appointment of consulting firm for the role of independent engineer for commercial utilization, operation and maintenance of multi-modal transport hub at sabarmati, ahmedabad
Read moreArchitectural finishing works including interior fit outs design and construction of external facade water supply sanitary installation drainage for 3 iconic elevated stations and 4 elevated stations of mumbai metro line 2b
Architectural finishing works including interior fit outs design and construction of external facade water supply sanitary installation drainage for 3 iconic elevated stations and 4 elevated stations of mumbai metro line 2b
Read moreProcurement of materials for ct overhauling and maintenance for central ac system of unit 1 to 5 at bktps.
Procurement of materials for ct overhauling and maintenance for central ac system of unit 1 to 5 at bktps.
Read moreSpl repair to govt md accn no p 93 1 6 at rwa yogendra enclave and provn of geysers 25 ltrs for jcos or md accn at kutir vihar nbc colony ke line karam singh line and yadunath vihar at ambala cantt under ge s ambala cantt
Spl repair to govt md accn no p 93 1 6 at rwa yogendra enclave and provn of geysers 25 ltrs for jcos or md accn at kutir vihar nbc colony ke line karam singh line and yadunath vihar at ambala cantt under ge s ambala cantt
Read moreSupply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Supply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Read moreAnnual percentage rate contract on mes ssr 2020 for civil maintenance of doors, s , wire mesh glasses, shutter and including other connected works of f-1,f-2, f-3,f-4,f-5,f-6, f-7 and f-9 in filling area inside at ofk.
Annual percentage rate contract on mes ssr 2020 for civil maintenance of doors, s , wire mesh glasses, shutter and including other connected works of f-1,f-2, f-3,f-4,f-5,f-6, f-7 and f-9 in filling area inside at ofk.
Read more(1) dismantling erection and repairing of 440 volt over head line from 6 pit to habitation near river side,agkcc,ka (2) repairing/maintenance of over head line 220 volt at 6 pit kcc and behind railway culvert,agkcc.(3) repairing and maintenance
(1) dismantling erection and repairing of 440 volt over head line from 6 pit to habitation near river side,agkcc,ka (2) repairing/maintenance of over head line 220 volt at 6 pit kcc and behind railway culvert,agkcc.(3) repairing and maintenance
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreof your Industry type