Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Conducting Of Drone Videography Using(phantom 4k Camera) Of Railway Corridor Along Alignment For A Length Of 51.00 Km For Monitoring Work Progress For Each Month For A Period Of 12 Months At Various Locations Between 0.50 To 51.50 Km In Connection With Construction Of New Bg Railway Line From Bairabi To Sairang(mizoram).
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76965838 |
Reference Number |
DyCE-CON-BS-Drone-AZL-03 |
Tender Fee | 0 |
EMD | 48100 |
Tender Value | |
Place | Guwahati |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76965838/viewNitPdf_4687077.pdf |
Start Date | August 26, 2024 19:44 |
End Date |
16/09/2024 ( Expired 291 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Conducting a drone videography uav/drone by capturing 4k resolution videography of the whole alignment and delivering the geotagged videos along with a player facility to upload & link image/drawings/other files etc. and linkage to gis map like google, bhuvan etc. with overlay/sync facility should be available & row, alignment, structure, in varanasi area of lucknow division under cpm varanasi.
For complete deion and other details, please refer to tender
Read moreConducting a drone videography uav/drone by capturing 4k resolution videography of the whole alignment and delivering the geotagged videos along with a player facility to upload & link image/drawings/other files etc. and linkage to gis map like google, bhuvan etc. with overlay/sync facility should be available & row, alignment, structure, in varanasi area of lucknow division under cpm varanasi.
For complete deion and other details, please refer to tender
Read moreConducting of drone videography using(phantom 4k camera) of railway corridor along alignment for a length of 51.00 km for monitoring work progress for each month for a period of 12 months at various locations between 0.50 to 51.50 km in connection with construction of new bg railway line from bairabi to sairang(mizoram).
For complete deion and other details, please refer to tender
Read moreEarthwork in formation for railway bg embankment, blanketing work as per rdso specification, construction of minor bridges including rubs (8 nos) along with protection works, construction of rcc retaining walls/drains, & 2 nos d class station buildings with circulating area and high level passenger platforms, 3 m wide fobs and all other connected ancillary works between km 9.760 to km 24.000 in connection with katihar- mukuria doubling project.
For complete deion and other details, please refer to tender
Read moreConducting of drone videography using(phantom 4k camera) of railway corridor along alignment for a length of 51.00 km for monitoring work progress for each month for a period of 12 months at various locations between 0.50 to 51.50 km in connection with construction of new bg railway line from bairabi to sairang(mizoram).
For complete deion and other details, please refer to tender
Read moreConducting final location survey with hybrid modern survey technology using dgps integrated rtk/ppk uas drone (npnt compliant from dgca) based photogrammetric and lidar system, conducting soil investigation & preparation and submission of various detailed drawings and preparation of estimate and dpr of 4th line between gondia - nagpur (134.00km) section & left out sections of 4th line between bilaspur - gondia of south east central railway.
For complete deion and other details, please refer to tender
Read moreHiring of 2 (two) nos. multi-utility vechicles with sitting capacity of 4/6 persons for the use of subordinates working under the unit of dy.chief engineer/con/aizawl at sairang & khamarang for a period of 2(two) years in connection with construction of new bg railway line from bairabi to sairang in the state of mizoram.
For complete deion and other details, please refer to tender
Read moreFeasibility survey for shifting of existing railway alignment/under ground construction between km.8/147 to 12/576 near airport on mys-cmnr section
For complete deion and other details, please refer to tender
Read moreProtection work of slope failure at ch. 30.600 - 30.700, provision of cable anchor at ch.25.338 near portal-1 of tunnel no. t/12a, construction of retaining wall on pile foundation and erfort wall at sang yard in between ch. 49.630 to ch. 49.875, earthwork in cutting / filling in between ch.35.165 to 35.225 & makg yard to ch. 45.675, dismantling & repairing of drain wall in tunnels and other ancillary works in connection with the construction of bairabi - sairang new bg railway li
For complete deion and other details, please refer to tender
Read moreJeypore -malkangiri new railway line project: construction of new bg railway line between jeypore (0.85 km from csb) to 41.5 km involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges, road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material supplies including supply of track ballast, new wide based psc sleepers, special psc sleepers (for turnouts, impro
For complete deion and other details, please refer to tender
Read moreof your Industry type