Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
C/O Lane At Reshipora Nanil Herpora (Nanil Herpora) Block K.Pora
|
| Description |
C/O Lane At Reshipora Nanil Herpora (Nanil Herpora) Block K.Pora
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_219185_11 |
|
Reference Number |
ENIT61of2023-24 |
| Tender Fee | 200 |
| EMD | 3000 |
| Tender Value | |
| Place | OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | June 29, 2023 14:30 |
| End Date |
Expired
04/07/2023
Expired 1105 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Leftover work for provn of ground exploitation system of aew and c at af stn borjhar
Leftover work for provn of ground exploitation system of aew and c at af stn borjhar
Read moreConstruction of day care phc building at badjambhila phc under bisoi block
Construction of day care phc building at badjambhila phc under bisoi block
Read moreRepair to sewage lines manholes and cleaning of sewage lines and septic tanks at zone c ins pallava under ge navy chennai
Repair to sewage lines manholes and cleaning of sewage lines and septic tanks at zone c ins pallava under ge navy chennai
Read moreConstruction of 1 additional class room at mggs dharmokda block pisangan distt ajmer
Construction of 1 additional class room at mggs dharmokda block pisangan distt ajmer
Read moreProviding additional toilet in 73 no b type quarters in block -i, p, r, y and t at nangal township (2nd phase).
Providing additional toilet in 73 no b type quarters in block -i, p, r, y and t at nangal township (2nd phase).
Read moreA)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line of sarubera colliery .
A)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line at sarubera colliery.
Read moreConstruction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Read moreReplacement of 250mm dia old/damaged sewer lines by p/l 400mm dia dwc hdpe pipe h no.2894 ram nagar to aggarwal sweets at mandoli road in ward no-223 in rohtash nagar ac-64 under ee (c)-05
Replacement of 250mm dia old/damaged sewer lines by p/l 400mm dia dwc hdpe pipe h no.2894 ram nagar to aggarwal sweets at mandoli road in ward no-223 in rohtash nagar ac-64 under ee (c)-05
Read morePlanning, designing and construction of residential and non residential infrastructure in phasei for establishment of cisf 12th reserve battalion at village jamunia talab, dist sehore (mp) pkg-i in epc mode-i. sh: c/o 242 nos. t-ii qtrs (15 blocks of stilt plus 4 and 1 block of gf), 12 nos t-iii qtrs (stilt plus 3), 5 nos t-i qtrs (g plus 2), 2 nos t-v qtrs. (duplex), training block (g plus 1), 10 bedded hospital (g plus 1), gos mess (gf), single accommodation for 57 sos (g plus 2), store block and tradesmen shop (g plus1), 701 mens barracks 3 blocks (g plus 2), quarter guard (gf), admin/ communication block (g plus 2), dhobi ghat (gf), 2 nos. elect sub stations, stp, 2 nos. ug sumps with pump rooms, i/c internal w/s, sanitary and ei, lifts, dg sets, fire alarm system, firefighting, solar pv power generation system, cctv system, air conditioning system, external civil and electrical service connections, and comprehensive development works .................. bulk services.
Read moreScraping and painting works at room no 16 to18 of main block, second floor along with east and central stair case within the compound of writers buildings during the year 2026-2027
Scraping and painting works at room no 16 to18 of main block, second floor along with east and central stair case within the compound of writers buildings during the year 2026-2027
Read moreof your Industry type