Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rate Contract For Handling, Transportation And Warehousing Support At Railhead Satna, District Satna, Madhya Pradesh
|
| Description |
Rate Contract For Handling, Transportation And Warehousing Support At Railhead Satna, District Satna, Madhya Pradesh
|
| Organisation | Hindustan Urvarak and Rasayan Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_HURL_874309_1 |
|
Reference Number |
HURL/HQ/CS609 |
| Tender Fee | 0 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | AS PER TENDER DOCUMENT |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=919071 |
| Start Date | August 26, 2025 20:30 |
| End Date |
Expired
03/09/2025
Expired 404 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Notice inviting tender for selection and empanelment of transportation - cum- handling contractors for main transportaion of food grains.
Notice inviting tender for selection and empanelment of transportation - cum- handling contractors for main transportaion of food grains.
Read moreTransportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Read moreHiring of trailers for material transportation between areas and within telangana and andhra pradesh states with 20t, 35t flat trailers and 40t low bed trailers under rate contract for a period of two years on per kilometer basis.
Hiring of trailers for material transportation between areas and within telangana and andhra pradesh states with 20t, 35t flat trailers and 40t low bed trailers under rate contract for a period of two years on per kilometer basis.
Read moreTransportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreHandling, local transportation and warehousing support at railhead -satna in satna district of mp
Handling, local transportation and warehousing support at railhead -satna in satna district of mp
Read moreRate contract for handling, transportation and warehousing support at railhead - rewa, district rewa, madhya pradesh
Rate contract for handling, transportation and warehousing support at railhead - rewa, district rewa, madhya pradesh
Read moreHandling, transportation and warehousing support at railhead bilaspur of state chattisgarh.
Handling, transportation and warehousing support at railhead bilaspur of state chattisgarh.
Read moreHandling, transportation and warehousing support at railhead tinsukia, dist. tinsukia assam.
Handling, transportation and warehousing support at railhead tinsukia, dist. tinsukia assam.
Read moreof your Industry type