Tender Details

Particulars Details
Title
Rate Contract For Handling, Transportation And Warehousing Support At Railhead Satna, District Satna, Madhya Pradesh
Description
Rate Contract For Handling, Transportation And Warehousing Support At Railhead Satna, District Satna, Madhya Pradesh
Organisation Hindustan Urvarak and Rasayan Limited | Central Govt. Ministry/Department
Tender Id 2025_HURL_874309_1
Reference
Number
HURL/HQ/CS609
Tender Fee 0
EMD 1 Lakh
Tender Value -
Place AS PER TENDER DOCUMENT
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=919071

Start Date August 26, 2025 20:30
End Date
Expired 03/09/2025

Expired 404 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Notice inviting tender for selection and empanelment of transportation - cum- handling contractors for main transportaion of food grains.

Notice inviting tender for selection and empanelment of transportation - cum- handling contractors for main transportaion of food grains.

Read more
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system

Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system

Read more
Hiring of trailers for material transportation between areas and within telangana and andhra pradesh states with 20t, 35t flat trailers and 40t low bed trailers under rate contract for a period of two years on per kilometer basis.

Hiring of trailers for material transportation between areas and within telangana and andhra pradesh states with 20t, 35t flat trailers and 40t low bed trailers under rate contract for a period of two years on per kilometer basis.

Read more
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.

Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Handling, local transportation and warehousing support at railhead -satna in satna district of mp

Handling, local transportation and warehousing support at railhead -satna in satna district of mp

Read more
Rate contract for handling, transportation and warehousing support at railhead - rewa, district rewa, madhya pradesh

Rate contract for handling, transportation and warehousing support at railhead - rewa, district rewa, madhya pradesh

Read more
Handling, transportation and warehousing support at railhead bilaspur of state chattisgarh.

Handling, transportation and warehousing support at railhead bilaspur of state chattisgarh.

Read more
Handling, transportation and warehousing support at railhead tinsukia, dist. tinsukia assam.

Handling, transportation and warehousing support at railhead tinsukia, dist. tinsukia assam.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise