Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Biennial Maintenance Contract For 02 Nos. Of Electronic Weigh Bidge Installed At Dry Ash Silo Of Stage 2 And Stage 3 At Ntpc Vindhyachal.
|
| Description |
Biennial Maintenance Contract For 02 Nos. Of Electronic Weigh Bidge Installed At Dry Ash Silo Of Stage 2 And Stage 3 At Ntpc Vindhyachal.
|
| Organisation | NTPC Limited(NTPC) |
| Tender Id | 2023_NTPC_81545_1 |
|
Reference Number |
NTPC/USSC-CPG3/9900269246 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | 0 |
| Place | Simhadri Super Thermal Power |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in |
| Start Date | November 22, 2023 16:30 |
| End Date |
Expired
11/12/2023
Expired 997 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bmc for rice lake make weigh bridge 03 nos installed in dry ash silo of ntpc bongaigaon
Bmc for rice lake make weigh bridge 03 nos installed in dry ash silo of ntpc bongaigaon
Read moreProcurement of cooling tower spares for dry ash system stage-1, ntpc vindhyachal
Procurement of cooling tower spares for dry ash system stage-1, ntpc vindhyachal
Read moreProcurement of ash silo telescopic chute spares for ntpc vindhyachal
Procurement of ash silo telescopic chute spares for ntpc vindhyachal
Read moreBiennial maintenance contract for electrotherapy make electrical operated hoist installed in ash handling system ntpc vindhyachal
Biennial maintenance contract for electrotherapy make electrical operated hoist installed in ash handling system ntpc vindhyachal
Read moreBiennial maintenance contract for ece make elevator installed at stage vfgd absorber area ntpc vindhyachal
Biennial maintenance contract for ece make elevator installed at stage vfgd absorber area ntpc vindhyachal
Read moreBiennial maintenance contract for carrier make water cooled screwchillers installed in stage iii of ntpc vindhyachal.
Biennial maintenance contract for carrier make water cooled screwchillers installed in stage iii of ntpc vindhyachal.
Read moreProcurement of silo vent fan spares for dry ash handling system for stage-1 and stage-2 ntpc barh
Procurement of silo vent fan spares for dry ash handling system for stage-1 and stage-2 ntpc barh
Read moreBiennial maintenance contract of analyzers installed for swas and statorwater conductivity for stage -1 at ntpc vindhyachal
Biennial maintenance contract of analyzers installed for swas and statorwater conductivity for stage -1 at ntpc vindhyachal
Read moreTransportation of cement from ntpc store , dry fly ash from ash silo,
Transportation of cement from ntpc store , dry fly ash from ash silo and supplying and transportation of sand to brick manufacturing plants atntpc korba
Read moreof your Industry type