Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement Works By Raising The North Side Drain In 275 N Road From Unit 3 Compound Wall Up To Road Crossing Cable Rack Support In Unit 4 And 5 Area
|
| Description |
Improvement Works By Raising The North Side Drain In 275 N Road From Unit 3 Compound Wall Up To Road Crossing&Amp#X0d
Cable Rack Support In Unit 4 And 5 Area
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_505904_1 |
|
Reference Number |
CE SE C TTPS Spec. No 237 24 25 |
| Tender Fee | 0 |
| EMD | 7300 |
| Tender Value | |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=601859 |
| Start Date | November 29, 2024 23:30 |
| End Date |
Expired
17/12/2024
Expired 563 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Improvement works to north side drain along 275 n road from storm water pump house to unit 3 compound wall at ttps
Improvement works to north side drain along 275 n road from storm water pump house to unit 3 compound wall at ttps
Read moreImprovement works to 275 n road north side drain from storm water pump house to unit 1 to 3 west side compound wall at ttps
Improvement works to 275 n road north side drain from storm&#x0d water pump house to unit 1 to 3 west side compound wall at ttps
Read moreImprovement works to south side drain along 275 n road from storm water pump house to unit 3 compound wall at ttps
Improvement works to south side drain along 275 n road from storm water pump house to unit 3 compound wall at ttps
Read moreImprovement works to the south side drain in 275 n road from unit 3 compound wall up to the entrance of switchyard 2 barricade ch 0 m to ch 170 m reach 1 in unit 4 and 5 area
Improvement works to the south side drain in 275 n road from unit 3 compound wall up to the entrance of&#x0d switchyard 2 barricade ch 0 m to ch 170 m reach 1 in&#x0d unit 4 and 5 area
Read moreRectification works by attending patch up to the existing damaged 275 n road unit 3 compound wall up to ash dyke gate at ttps
Rectification&#x0d works by attending patch up to the existing damaged 275 n&#x0d road unit 3 compound wall up to ash dyke gate at ttps
Read moreClearing the scrub jungle in the 275 n road north side of switchyard 2 building in unit 4 and 5 area
Clearing the scrub&#x0d jungle in the 275 n road north side of switchyard 2 building in unit 4 and 5 area
Read moreRectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack (pcr 5) support columns from unit 3 compound wall to esp 4 rear side up to chimney 3
Rectification works to the damaged pedestals and providing&#x0d encasing concrete to the structural steel columns along pipe&#x0d rack (pcr 5) support columns from unit 3 compound wall&#x0d to esp 4 rear side up to chimney 3
Read moreRectification works by attending patch up to the existing damaged 45 n bt road from cwph 2 in north side of zone 1 towards east side up to east compound wall ttps
Rectification works by attending patch up to the existing damaged 45 n bt road from cwph 2 in north side of&#x0d zone 1 towards east side up to east compound wall ttps
Read moreRectification works by attending patch up to the existing damaged 275 n road from unit 3 compound wall to storm water pump house and resurfacing the existing black topping road at ttps
Rectification works&#x0d by attending patch up to the existing damaged 275 n road from&#x0d unit 3 compound wall to storm water pump house and&#x0d resurfacing the existing black topping road at ttps
Read moreRepair works to the barricade gate in the north side of switchyard 2 in 275 n road in a zone area
Repair works to the barricade gate in the north side of switchyard 2 in 275 n road in a zone area
Read moreof your Industry type