Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Solenoid Valves Along With Coil
|
| Description |
Solenoid Valve Along With Coil For Main Turbine Extraction Nr Vs
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 691777 |
|
Reference Number |
08/26-27/ IC-VI/P-21/CE/OM/KTPS-VVI Stages |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | April 10, 2026 00:30 |
| End Date |
Expired
29/04/2026
Expired 85 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreProcurement of supply of asco make solenoid valves along with coil
Procurement of supply of asco make solenoid valves along with coilcomplete assembly under pcp package for ntpc barh
Read moreSolenoid coil 24v dc for operation of pneumatic solenoid valves.,solenoid coil 48v dc for operation
Read more
Solenoid coil 24v dc for operation of pneumatic solenoid valves.,solenoid coil 48v dc for operation
Read more
Supply of rotex make solenoid valaves along with coil (complete
Supply of rotex make solenoid valaves along with coil (completeassembly) under pcp package for barh at unit3
Read moreof your Industry type