Tran. Line Package Tl01 Ananthapuram Iii
|
| Description |
Pre Bid Tie Up Of Transmission Line Package Tl01 For 765k V D/C Ananthapuram Iii Krishnagiri Tl Part I Associated With Transmission System For Integration Of Ananthapuram Iii Rez Phase I Through Tbcb Route.
|
| Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
| Tender Id | 27640 |
|
Reference Number |
CC/T/W-TW/DOM/A10/26/05393 |
| Tender Fee | 25000 |
| EMD | 0 |
| Tender Value | - |
| Place | Andhra Pradesh |
| Link |
View Original Tender Notice
https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=f0b8c6a1-946e-4aaa-8738-c6c51bf1e222 |
| Start Date | April 17, 2026 00:39 |
| End Date |
Expired
30/04/2026
Expired 148 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Package iii laying of cc roads, construction of minor bridges, ugd lines, cc drains and culverts in adilabad mpty under tufidc
Package iii laying of cc roads, construction of minor bridges, ugd lines, cc drains and culverts in adilabad mpty under tufidc
Read morePackage v laying of cc roads, construction of cc drains in ward no. 26,27,28,29,30,31,32,33,34,46 and 47 of adilabad municipality under tufidc
Package v laying of cc roads, construction of cc drains in ward no. 26,27,28,29,30,31,32,33,34,46 and 47 of adilabad municipality under tufidc
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read morePackage ii laying of bt and ccroads, construction of storm water drains, minor bridge, ugd lines, cc drains and culverts in adilabad mpty under tufidc
Package ii laying of bt and ccroads, construction of storm water drains, minor bridge, ugd lines, cc drains and culverts in adilabad mpty under tufidc
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreTran. line package tl02 ananthapuram-iii
Pre-bid tie up of transmission line package tl02 for 765kv d/c ananthapuram-iii-krishnagiri tl part-ii associated with transmission system for integration of ananthapuram-iii rez phase-i envisaged through tbcb route
Read moreTransmission line package tl01
Transmission line package tl01 for construction of 132kv d/c (single htls equivalent panther) transmission line from rammam-iii hep to powergrid rangpo substation under consultancy services to ntpc ltd.
Read moreTransmission line package tl01
Transmission line package tl01 for i) lilo of both ckts of 400 kv fatehgarh-iv ps - barmer-i ps at barmer-ii ps ii) 400 kv barmer-ii ps barmer-i ps d/c line (quad) iii) 800 kv hvdc bipole line (hexa lapwing) between barmer-ii (hvdc) and south kalamb (hvdc) (part-i) associated with transmission system for evacuation of power from rajasthan rez ph-iv (part-5 6 gw) (barmer complex) barmer-ii: 6 gw (solar) under tbcb route
Read moreTransmission line package tl01
Pre-bid tie up for transmission line package tl01 associated with construction of 400/220/132 kv grid substation at joda/barbil with associated transmission lines through tariff based competitive bidding (tbcb) route prior to rfp bid submission by powergrid to bpc.
Read moreTransmission line package tl01
Transmission line package tl01 for 765 kv d/c halvad - kandla (gis) line associated with transmission system for supply of power to green hydrogen/ammonia manufacturing potential in kandla area of gujarat (phase-i: 3 gw)
Read moreof your Industry type