Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Three Number Of Old Pontoons And Fabrication Of Two Nos New Pontoon Before Monsoon At Jhingurda Project
|
| Description |
Repairing Of Three Number Of Old Pontoons And Fabrication Of Two Nos New Pontoon Before Monsoon At Jhingurda Project
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_330649_1 |
|
Reference Number |
NCL/JRD/ENM/Tender/24-25/59 |
| Tender Fee | 0 |
| EMD | 9200 |
| Tender Value | - |
| Place | Jhingurda Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342746 |
| Start Date | February 28, 2025 22:30 |
| End Date |
Expired
11/03/2025
Expired 581 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling of old damaged platform with its bracing and two way chute and fabrication of the same at surface bunker of ncph colliery r-6 mine, ncph sub-area
Dismantling of old damaged platform with its bracing and two way chute and fabrication of the same at surface bunker of ncph colliery r-6 mine, ncph sub-area
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreRepairing of three number of old pontoons and fabrication of one no new pontoon before monsoon at jhingurda project
Repairing of three number of old pontoons and fabrication of one no new pontoon before monsoon at jhingurda project
Read moreRepairing of old pontoons for pumps before monsoon at block-b project.
Repairing of old pontoons for pumps before monsoon at block-b project.
Read moreDismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump and motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 (monsoon activity no. 04 ) in kakri
Dismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump and motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 (monsoon activity no. 04 ) in kakri
Read moreDismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 in kakri project
Dismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 in kakri project
Read moreFabrication, commissioning of new pontoons and dismantling, repairing, commissioning of old pontoons and its pathway for monsoon 25-26 at block-b project.
Fabrication, commissioning of new pontoons and dismantling, repairing, commissioning of old pontoons and its pathway for monsoon 25-26 at block-b project.
Read moreRepairing of 04 sets of old ms pontoon (dismantling, fabrication and erection work) during monsoon 2025.
Repairing of 04 sets of old ms pontoon (dismantling, fabrication and erection work) during monsoon 2025.
Read moreRepairing of pontoon, drum pontoon and fabrication of ladder on pontoon required during monsoon 2024 at krishnashila project.
Repairing of pontoon, drum pontoon and fabrication of ladder on pontoon required during monsoon 2024 at krishnashila project.
Read moreof your Industry type