Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hydrofracturing Of 30 Nos Tubewell And Other Allied Work In Various Villages Of Block Gyaraspur In District Vidisha
|
| Description |
Hydrofracturing Of 30 Nos Tubewell And Other Allied Work In Various Villages Of Block Gyaraspur In District Vidisha
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PHED_309063_1 |
|
Reference Number |
06/2023-24 |
| Tender Fee | 2000 |
| EMD | 13061 |
| Tender Value | - |
| Place | EEPHED Division Vidisha |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | September 18, 2023 23:30 |
| End Date |
Expired
30/09/2023
Expired 1112 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Substation renovation vidisha circle. (r and m renovation of various 33/11 kv sub-station control room, toilets and fencing under o and m circle vidisha (12 no. s/s)- golna, naya gola, satpada, gulabganj, gyaraspur, ramleela maidan, uhar, udaipur, c
Substation renovation vidisha circle. (r and m renovation of various 33/11 kv sub-station control room, toilets and fencing under o and m circle vidisha (12 no. s/s)- golna, naya gola, satpada, gulabganj, gyaraspur, ramleela maidan, uhar, udaipur, c
Read moreDrilling of 30 nos 300x100 mm dia 75 mtr deep gravel packed tubewells including installation of handpump and construction of plate form in block porsa different villages of district morena including all allied works complete.
Drilling of 30 nos 300x100 mm dia 75 mtr deep gravel packed tubewells including installation of handpump and construction of plate form in block porsa different villages of district morena including all allied works complete.
Read moreDrilling of 30 nos 300x100 mm dia 75 mtr deep gravel packed tubewells including installation of handpump and construction of plate form in block ambah different villages of district morena including all allied works complete.
Drilling of 30 nos 300x100 mm dia 75 mtr deep gravel packed tubewells including installation of handpump and construction of plate form in block ambah different villages of district morena including all allied works complete.
Read moreAnnual rate contract for providing, laying, jointing, testing and commissioning of pipe line and allied works in various villages towns of district bundi
Annual rate contract for providing, laying, jointing, testing and commissioning of pipe line and allied works in various villages towns of district bundi
Read moreNashik ( ambad ) industrial area. providing power supply arrangement to cetp at plot no.30 and allied works in ambad industrial area.
Nashik ( ambad ) industrial area. providing power supply arrangement to cetp at plot no.30 and allied works in ambad industrial area.
Read moreProviding and fixing of street light fittings along with its allied accessories at various dark spots in ac-34 matiala constituency under south west zone.eee/swz/2026-27/30-01
Providing and fixing of street light fittings along with its allied accessories at various dark spots in ac-34 matiala constituency under south west zone.eee/swz/2026-27/30-01
Read moreConstruction of a bridge cum barrage across the malaprabha river at chikkahattiholi village, khanapur taluk, belagavi district along with allied works including sopanam, left bank protection and connecting roads from chikkahattiholi and karvinkoppa villages together with operation and maintenance for a period of 5 years
Construction of a bridge cum barrage across the malaprabha river at chikkahattiholi village, khanapur taluk, belagavi district along with allied works including sopanam, left bank protection and connecting roads from chikkahattiholi and karvinkoppa villages together with operation and maintenance for a period of 5 years
Read moreEpair/replacement of flooring wall tiling plumbing and allied works at unit area zone b, comprehensive maintenance of stps of capacity varies from 30 kld to 800 kld capacity including repla of filters, cleaning of sludge beds, tube settlers, repairs
Repair/replacement of flooring wall tiling plumbing and allied works at unit area zone b, comprehensive maintenance of stps of capacity varies from 30 kld to 800 kld capacity including repla of filters, cleaning of sludge beds, tube settlers, repairs
Read moreSelection of epc turnkey contractor for sitc of 01 no. 25/30 mva ( onan/onaf), 132/33 kv power transformer with nifps, associated civil works, control and protection system and allied works at bhaklai phase-iii narmada water supply project second cal
Selection of epc turnkey contractor for sitc of 01 no. 25/30 mva ( onan/onaf), 132/33 kv power transformer with nifps, associated civil works, control and protection system and allied works at bhaklai phase-iii narmada water supply project second cal
Read moreSpl repair and replacement of light switch gears light panels in bldg no p 30 a8 jco living bldg no p120 jco mess at 172 inf ta madras cincan land (army) spl repairs of lt panels and allied works at ins baaz campbell bay under ge campbell bay
Spl repair and replacement of light switch gears light panels in bldg no p 30 a8 jco living bldg no p120 jco mess at 172 inf ta madras cincan land (army) spl repairs of lt panels and allied works at ins baaz campbell bay under ge campbell ba
Read moreof your Industry type