Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Refurbishment Of Spare Turbine Rotor Of Tpp.
|
| Description |
Refurbishment Of Spare Turbine Rotor Of Tpp.
|
| Organisation | Bokaro Power Supply Company (P) Limited | Public Sector Undertakings |
| Tender Id | 2024_BPSCL_182044_1 |
|
Reference Number |
23-24/C-177/NIT-1386 |
| Tender Fee | 0 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | BPSCL, BOKARO STEEL CITY |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=199259 |
| Start Date | January 17, 2024 16:45 |
| End Date |
Expired
04/03/2024
Expired 954 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine of
Reconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine ofntpc anta
Read moreRefurbishment and hsb of rgc turbine rotor of dhdt unit of mathura refinery
Refurbishment and hsb of rgc turbine rotor of dhdt unit of mathura refinery
Read moreAssembly of gas turbine rotor with the supply of consumables make
Assembly of gas turbine rotor with the supply of consumables makesiemens model v94.2 at ntpc dadri
Read moreRefurbishment of nozzles and blades of ge frame 9e gas turbine of ntpc kawas
Refurbishment of nozzles and blades of ge frame 9e gas turbine of ntpc kawas
Read moreProcurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Read moreSupply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Read moreProcurement of braun make spares for turbine bfp and hydro turbine
Procurement of braun make spares for turbine bfp and hydro turbine speed measuring instruments for stage 2 3 4 5
Read moreRefurbishment of existing analyzer shelters
Refurbishment of existing analyzer shelters installed at all plant areas of gail pata
Read moreof your Industry type