Tender Details
Particulars | Details |
---|---|
Title |
Providing And Fixing Of View Cutter On Viaduct Along Up Line Between Section Paschim Vihar East Madipur Metro Station And At Paschim Vihar East Metro Station Of Line 5 E.
|
Description |
Providing And Fixing Of View Cutter On Viaduct Along Up Line Between Section Paschim Vihar East Madipur Metro Station And At Paschim Vihar East Metro Station Of Line 5 E.
|
Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
Tender Id | 2025_DMRC_847004_1 |
Reference Number |
OCW-1834 |
Tender Fee | 5900 |
EMD | 1.1 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=890362 |
Start Date | March 10, 2025 14:30 |
End Date |
17/03/2025 ( Expired 57 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreStrengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Strengthening and bituminous overlay along with other rectification activities-drain cover replacement, kerb raising, mbcb replacement, painting etc. of orai bhognipur barah section on bot (annuity) basis in the state of up-3rd call
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreDesign and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Read moreSupply and installation in relation to setup up of laboratory at buck semen station katulpur, bankura on turnkey basis under paschim banga go-sampad bikash sanstha, kolkata-700106
Supply and installation in relation to setup up of laboratory at buck semen station katulpur, bankura on turnkey basis under paschim banga go-sampad bikash sanstha, kolkata-700106
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreSetting up of 1000 mw solar pv plant on turnkey basis along with 02 (two) years comprehensive operation and maintenance at rvunl 2000 mw solar park at pugal, district- bikaner of rajasthan
Setting up of 1000 mw solar pv plant on turnkey basis along with 02 (two) years comprehensive operation and maintenance at rvunl 2000 mw solar park at pugal, district- bikaner of rajasthan
Read moreProviding and fixing rcc road divider on coal transportation road at gevra project of gevra area(phase ii)
Providing and fixing rcc road divider on coal transportation road at gevra project of gevra area(phase ii)
Read moreImprovement works to the dry stone revetment along the sides of the low pressure and high pressure penstock line between papanasam di weir and surge tank with allied works at papanasam lower camp
Improvement works to the dry stone revetment along the sides of the low pressure and high pressure penstock line between papanasam di weir and surge tank with allied works at papanasam lower camp
Read moreof your Industry type