Tender Details
About Tender
🛣️ Invitation For Bids: Expressway Connector Construction 🏗️ The Maharashtra State Road Development Corporation (Msrdc) Is Calling For Bids From Experienced Contractors For The Construction Of An Access Controlled Expressway Connector To The Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg From Jalna To Nanded. 🗺️ 📅 Bid Submission Deadline: April 16, 2024, 3:00 Pm This Project Is On An Engineering, Procurement, And Construction (Epc) Basis For Package Jne01. Interested Bidders Must Submit Detailed Proposals, Including Financial Bids, Technical Specifications, And Project Execution Plans. Tender Fee: Inr 11,80,000 Emd: Not Applicable Bidders Should Ensure Their Proposals Meet The Stringent Requirements Of The Msrdc And Adhere To The Guidelines Provided In The Tender Document. Keywords: Expressway Connector, Construction, Maharashtra State Road Development Corporation, Epc Mode, Maharashtra Samruddhi Mahamarg, Package Jne01, Infrastructure Project, Government Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Of Access Controlled Expressway Connector To Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg From Jalna To Nanded On Epc Mode For Package Jne01
|
Description |
Of Access Controlled Expressway Connector To Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg From Jalna To Nanded On Epc Mode For Package Jne01
|
Organisation | Maharashtra State Road Development Corporation | State Govt. and UT |
Tender Id | 2024_MSRDC_986710_1 |
Reference Number |
T 2705 |
Tender Fee | 11.8 Lakh |
EMD | 0 |
Tender Value | |
Place | Mumbai |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1723895 |
Start Date | January 18, 2024 22:30 |
End Date |
16/04/2024 ( Expired 398 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreReconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type