Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Downward Ramp On Right Hand Side To Existing Rob And Providing Service Road On Either Side Of Rob For A Length Of 4 Km In Ramagundem Town Limits In Peddapally District.
|
| Description |
Providing Downward Ramp On Right Hand Side To Existing Rob And Providing Service Road On Either Side Of Rob For A Length Of 4.0 Km In Ramagundem Town Limits In Peddapally District. (2nd Call)
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 595163 |
|
Reference Number |
Chief Engineer (RB) State Roads, e-NIT No. 14/1/CE(SR)/SE(DP)-II/EE-III/DEE-II/AEE/2025, Date.06.05.2025 |
| Tender Fee | 11800 |
| EMD | 16.11 Lakh |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | May 15, 2025 21:30 |
| End Date |
Expired
22/05/2025
Expired 508 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Phase ii works for development of 2 nos. a site retail outlets namely at sy no. 177a/1a,177a/1b,177a/1c on bellary city (from sp circle till bellary town limits towards siruguppa from sp circle via havambhavi) on either side, bellary dist, and sy
Phase ii works for development of 2 nos. a site retail outlets namely at sy no. 177a/1a,177a/1b,177a/1c on bellary city (from sp circle till bellary town limits towards siruguppa from sp circle via havambhavi) on either side, bellary dist, and sy
Read moreProviding downward ramp on right hand side to existing rob and providing service road on either side of rob for a length of 4.0 km in ramagundem town limits in peddapally district.
Providing downward ramp on right hand side to existing rob and providing service road on either side of rob for a length of 4.0 km in ramagundem town limits in peddapally district.
Read moreProviding downward ramp on right hand side to existing rob and providing service road on either side of rob for a length of 4 km in ramagundem town limits in peddapally district.
Providing downward ramp on right hand side to existing rob and providing service road on either side of rob for a length of 4 km in ramagundem town limits in peddapally district.
Read moreProviding downward ramp on right hand side to existing rob and providing service road on either side of rob for a length of 4.0 km in ramagundem town limits in peddapally district(6th call)
Providing downward ramp on right hand side to existing rob and providing service road on either side of rob for a length of 4.0 km in ramagundem town limits in peddapally district(6th call).
Read moreConstruction of rob in lieu of l.c.no.134 in kamalapuram town limits at railway km 283/3-4 of renigunta guntakal section in y.s.r kadapa district
Construction of rob in lieu of l c no 134 in kamalapuram town limits at railway km 283/3-4 of renigunta guntakal section in ysr kadapa district
Read moreConstruction of rob in lieu of l.c.no.134 in kamalapuram town limits at railway km 283/3-4 of renigunta guntakal section in y.s.r kadapa district
Construction of rob in lieu of l c no 134 in kamalapuram town limits at railway km 283/3-4 of renigunta guntakal section in ysr kadapa district
Read moreConstruction of a site retail outlet - within likabali town urban municipal limits on right hand side of akajan - likabali-basar road not on nh, dist.-west siang, arunachal pradesh
Construction of a site retail outlet - within likabali town urban municipal limits on right hand side of akajan - likabali-basar road not on nh, dist.-west siang, arunachal pradesh
Read moreUpgradation of old nh-7 from 2-lane to 4-lane divided carriageway in seoni town for a length of 12.67 km. and construction of new rob for a length of 630m (approx.) in seoni town in the state of madhya pradesh on epc mode.
Upgradation of old nh-7 from 2-lane to 4-lane divided carriageway in seoni town for a length of 12.67 km. and construction of new rob for a length of 630m (approx.) in seoni town in the state of madhya pradesh on epc mode.
Read moreConstruction of additional rob geometrical improvements and strengthening of existing rob and approaches from km 0/0 to 1/0 in vikarabad town limits at railway km 111/6-8 on secunderabad-wadi section connecting vikarabad district head quarter to hyderabad highway in vikarabad district - (sub-work for conducting preliminary sub soil investigation work for rob and approaches)
Construction of additional rob geometrical improvements and strengthening of existing rob and approaches from km 0/0 to 1/0 in vikarabad town limits at railway km 111/6-8 on secunderabad-wadi section connecting vikarabad district head quarter to hyderabad highway in vikarabad district - (sub-work for conducting preliminary sub soil investigation work for rob and approaches)
Read moreConstruction work of a new 4-lane railway over bridge (rob) of 980 meters length (from harifatak square to neelkanth dwar) in ujjain city, including two additional 2-lane legs (total ramp length 500 meters - 140 meters towards badnagar and 360 meters
Construction work of a new 4-lane railway over bridge (rob) of 980 meters length (from harifatak square to neelkanth dwar) in ujjain city, including two additional 2-lane legs (total ramp length 500 meters - 140 meters towards badnagar and 360 mete
Read moreof your Industry type