Tender Details

Particulars Details
Title
Const. Of Lane From Old Nh Alignment 1 A Kud To Mal Road To The House Of Sh. Raghuveer Singh
Description
Boq
Organisation Government of Jammu and Kashmir
Tender Id 2023_PWDJK_219752_1
Reference
Number
Fresh e-NIT No. 63 of 23-24 Dt. 04.07.2023 2nd Cal
Tender Fee 600
EMD 11660
Tender Value -
Place Udhampur
Link
View Original Tender Notice

https://jktenders.gov.in

Start Date July 04, 2023 23:30
End Date
Expired 12/07/2023

Expired 1193 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
13 construction of cc road and drain in char rehat, baluganj, from house no 3b of raghuveer singh towards suman house and in the adjoining lane near dorilal baghel house, agra

13 construction of cc road and drain in char rehat, baluganj, from house no 3b of raghuveer singh towards suman house and in the adjoining lane near dorilal baghel house, agra

Read more
Stmc work on nh-56 old nh-113, pratapgarh-padi section and construction of 2 lane road in forest area, km 38/100-43/040, 46/500-47/080 and 51/640-54/500, nh-113 on epc mode, rajasthan

Stmc work on nh-56 old nh-113, pratapgarh-padi section and construction of 2 lane road in forest area, km 38/100-43/040, 46/500-47/080 and 51/640-54/500, nh-113 on epc mode, rajasthan

Read more
Cs for fs and prep. of dpr for improvement to 2 lane with ps from mishraulia to bhengari of nh 727b and cs for prep. of dpr for construction of 4 lane rob parallel to existing old rob over samastipur_darbhanga railway line at km 67.000 of nh 322.

Cs for fs and prep. of dpr for improvement to 2 lane with ps from mishraulia to bhengari of nh 727b and cs for prep. of dpr for construction of 4 lane rob parallel to existing old rob over samastipur_darbhanga railway line at km 67.000 of nh 322.

Read more
Construction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.

Construction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.

Read more
Rectification of defects on four lane gujarat-maharashtra border-surat-hazira port section of nh-53 (old nh-6) (approx. length 131.500 km) in the state of gujarat on single percentage item rate basis at risk and cost of concessionaire

Rectification of defects on four lane gujarat-maharashtra border-surat-hazira port section of nh-53 (old nh-6) (approx. length 131.500 km) in the state of gujarat on single percentage item rate basis at risk and cost of concessionaire

Read more
One time improvement of the old two lane bypassed portion of nh 20passing through belpahali village from km 34.400 to km 35.880 in keonjher district in the state of odisha

One time improvement of the old two lane bypassed portion of nh 20passing through belpahali village from km 34.400 to km 35.880 in keonjher district in the state of odisha

Read more
Construction of 4-lane vup at km 13.000 including construction of new service road, exit and entry, drain and highway lighting on kaithal to rajasthan-haryana border section of old nh-65 (new nh-152) in the state of haryana on epc mode.

Construction of 4-lane vup at km 13.000 including construction of new service road, exit and entry, drain and highway lighting on kaithal to rajasthan-haryana border section of old nh-65 (new nh-152) in the state of haryana on epc mode.

Read more
O and m including routine maintenance and incident management of 4 laning of existing 2 lane with paved shoulder road from talwandi bhai to ferozepur on nh-05 (old nh-95) from km 170.000 to km 194.040 in the state of punjab.

O and m including routine maintenance and incident management of 4 laning of existing 2 lane with paved shoulder road from talwandi bhai to ferozepur on nh-05 (old nh-95) from km 170.000 to km 194.040 in the state of punjab.

Read more
Construction of 03 nos. of 3 lane robs and 07 no of vups on 6l delhi agra section old nh-2 (new nh 44 and 19) from km. 20.500 to km. 200.000 in the state of haryana and uttar pradesh on epc mode.

Construction of 03 nos. of 3 lane robs and 07 no of vups on 6l delhi agra section old nh-2 (new nh 44 and 19) from km. 20.500 to km. 200.000 in the state of haryana and uttar pradesh on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise