Tender Details

Particulars Details
Title
Garbage Vehicle (Tipper) And Other Vehicle Repairing/Maintenance Work In Nagar Parishad, Tendukheda
Description
Garbage Vehicle (Tipper) And Other Vehicle Repairing/Maintenance Work In Nagar Parishad, Tendukheda
Organisation Directorate Urban Administration and Development | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2295
EMD 4000
Tender Value
Place Nagar Parishad, Tendukheda
Link

AAAAAAAAAA

Login to view
Start Date April 16, 2025 23:35
End Date

05/05/2025 ( 15 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)

Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)

Read more
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Read more
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Read more
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.

Read more

Balance work of widening improvement to 2 lane lane with paved shoulder from km 27.150 to km 47.682 on dibrugarh to ledo section with proposed margherita and ledo bypass of nh 38 in tinsukia

Read more
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode

Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode

Read more
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh

Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh

Read more
Consultancy services for accompanying measures- support of mmpcl/discoms in strengthening of mp discoms in operation and maintenance, implementation of an esms (environmental and social management system) and capacity, building, strategic planning an

Consultancy services for accompanying measures- support of mmpcl/discoms in strengthening of mp discoms in operation and maintenance, implementation of an esms and capacity, building, strategic planning and training

Read more
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Read more
Outsourcing maintennace at ph-1 to ph-4 of mukerian hydel project pspcl talwara punjab

Outsourcing the work of routine, prive maintenance, breakdown maintenance and annual overhauling of generating units, switchyards and other allied equipment through contractor at ph 1 to 4 of mukerian hydel project pspcl talwara pb

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise