Tender Details

Particulars Details
Title
Nctpsii Civil Maintenance Circle Civil Maintenance Division Raising The Floor Level By Providing Rcc To Avoid Water Stagnation At 0 M Level Of Sscc Imc Unit I Area
Description
Nctps Ii Civil Maintenance Circle Civil Maintenance Division Raising The Floor Level By Providing Rcc To Avoid Water Stagnation At 0 M Level Of Sscc Imc Unit I Area
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_522524_1
Reference
Number
CE/NCTPS-II/SE/CM/50/2024-25
Tender Fee 0
EMD 15600
Tender Value -
Place NCTPS II
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=622074

Start Date February 04, 2025 23:30
End Date
Expired 17/02/2025

Expired 604 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Nctps ii civil maintenance circle civil maintenance division construction of rcc retaining wall to avoid earth slip near the northern side of the cooling water intake structure from ch 0 00m to ch 15 50m and clearing of heavy jungle on ei

Nctps ii civil maintenance circle civil maintenance division construction of rcc retaining wall to avoid earth slip near the northern side of the cooling water intake structure from ch 0 00m to ch 15 50m and clearing of heavy jungle on ei

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Nctps ii civil maintenance circle civil maintenance division raising the floor level by providing rcc to avoid water stagnation at 0m level of mill repair bay in front of a/c plant

Nctps ii civil maintenance circle civil maintenance division raising the floor level by providing rcc to avoid water stagnation at 0m level of mill repair bay in front of a/c plant

Read more
Construction of storm water rcc drains to avoid stagnation of water during rains in kundli town.

Construction of storm water rcc drains to avoid stagnation of water during rains in kundli town.

Read more
Raising of approach road on either side of poira khorjuvem bridge to avoid water stagnation in v p mayem in mayem constituency

Raising of approach road on either side of poira khorjuvem bridge to avoid water stagnation in v p mayem in mayem constituency

Read more
Raising the level of the road stretch in between shivaji statue and bharathi nagar 7th cross junction to avoid stagnation of rain water in the northern side of town ecr puducherry- 2nd call

Raising the level of the road stretch in between shivaji statue and bharathi nagar 7th cross junction to avoid stagnation of rain water in the northern side of town ecr puducherry- 2nd call

Read more
Wbkp/cp/nit-263/ raising of floor level of the campus to pr rain water stagnation at police station within parnasree police station complex /ten, dated.18.06.2025

Raising of floor level of the campus to pr rain water stagnation at police station within parnasree police station complex, during the year 2025-2026.