Tender Details
Particulars | Details |
---|---|
Title |
Drawing 11k V Feeder Using Abc From 110 K V Guruvayur Substation To Ardra Palli Road Under Electrical Section, Guruvayur
|
Description |
This Estimate Is Proposed For Drawing Ht Abc From 110k V S/S, Guruvayur To Ardra Palli Road Transformer To Interlink The Newly Proposed Chowallur Padi Feeder With Guruvayur Feeder.
|
Organisation | Kerala State Electricity Board | State Govt. and UT |
Tender Id | 2024_KSEB_714842_1 |
Reference Number |
110/EE/PMU-TSR/24-25/10.12.24 |
Tender Fee | 1534 |
EMD | 15900 |
Tender Value | |
Place | 110kV S/s Guruvayur |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1127922 |
Start Date | December 13, 2024 15:30 |
End Date |
23/12/2024 ( Expired 144 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreCementation of road and drain construction work from shaheed ashfaqullah khan ward ghulam mo akhara ground to dr. tajdar house under division number 16
Cementation of road and drain construction work from shaheed ashfaqullah khan ward ghulam mo akhara ground to dr. tajdar house under division number 16
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreof your Industry type