| Particulars | Details |
|---|---|
| Title |
Construction Of 33k V Single Circuit Line From 33k V Substation Inkel To 33k V Substation Othukkungal
|
| Description |
Construction Of 33k V Single Circuit Line From 33k V Substation Inkel To 33k V Substation Othukkungal Including Supply, Installation Testing And Commissioning Of 33k V Xlpe Ccsx 120sqmm Aaac Covered Conductor.
|
| Organisation | Kerala State Electricity Board | State Govt. and UT |
| Tender Id | 2024_KSEB_721783_1 |
|
Reference Number |
TRCM/E-13/2024-25 dt.31.12.2024 |
| Tender Fee | 8850 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | Oorakam |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1143916 |
| Start Date | January 03, 2025 20:30 |
| End Date |
Expired
17/01/2025
Expired 616 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
1)construction of the storm water drain from agriculture market to saidapur cross road, 2) construction of the storm water from karimnagar road to model cheruvu (via srinagar colony entrance) in huzurabad municipality under nagarabhivrudhi funds - 6th call
Read more1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
1) construction of the storm water drain from srisapally cross road, 2) construction of the storm water from prathapa sai reddy garden to gundla cheruvu water way in huzurabad municipality under nagarabhivrudhi funds -6th call
Read moreGodavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreConstruction of new single circuit 33kv line from 110kv substation pazhayannur to 33kv substation elanad
Construction of new single circuit 33kv line from 110kv substation pazhayannur to 33kv substation elanad
Read moreCon of existing single circuit line to double circuit from 110kv substation kandassankadavu to 33kv substation vatanappally
Con of existing single circuit line to double circuit from 110kv substation kandassankadavu to 33kv substation vatanappally
Read moreCon of 33kv single circuit line to double circuit from 110kv substation kandassankadavu to 33kvsubstation vatanappally -construction of 33kv feeder bay at kandassankadvu and vatanappally substation
Con of 33kv single circuit line to double circuit from 110kv substation kandassankadavu to 33kvsubstation vatanappally -construction of 33kv feeder bay at kandassankadvu and vatanappally substation
Read moreCon of 33kv single circuit line to double circuit from 110kv substation kandassankadavu to 33kv substation vatanappally - construction of 33kv feeder bay at kandassankadvu and vatanappally substations -re tender
Con of 33kv single circuit line to double circuit from 110kv substation kandassankadavu to 33kv substation vatanappally - construction of 33kv feeder bay at kandassankadvu and vatanappally substations - re tender
Read moreof your Industry type