Tender Details
Particulars | Details |
---|---|
Title |
Ohe Modification Work In Connection With Provision Of Rub In Lieu Of Lc No. 122/C &Amp 145/C On Amethi Raebareli Lucknow Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77726383 |
Reference Number |
TRD-16-SRDEE-LKO-2024 |
Tender Fee | 0 |
EMD | 57800 |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77726383/viewNitPdf_4730639.pdf |
Start Date | October 16, 2024 21:12 |
End Date |
14/11/2024 ( Expired 179 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreDesljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreMaintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t
Maintenance work of sindoor river to start of bareli bypass section of nh-12 from existing km 130.10 to km 194.0 (design ch. 130.000 to ch. 193.000) in the state of m.p. to four lanes with paved shoulders on epc mode under nhdp-iii (package iii) on t
Read moreConsultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreConstruction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.
Read moreWork of covering the drain on both sides from agrawal sweets to canal road in ward no. 07 and 16 in the municipal area khoda-makanpur with rcc slabs and cc chequered tiles.
Work of covering the drain on both sides from agrawal sweets to canal road in ward no. 07 and 16 in the municipal area khoda-makanpur with rcc slabs and cc chequered tiles.
Read moreConstruction work of barbed wire fencing towards the land of parks and forest department and internal work of water supply and water connection in the area of kisan plot in sector-19c of vrindavan yojna no.4, lucknow
Construction work of barbed wire fencing towards the land of parks and forest department and internal work of water supply and water connection in the area of kisan plot in sector-19c of vrindavan yojna no.4, lucknow
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreof your Industry type