Tender Details

Particulars Details
Title
Ohe Modification Work In Connection With Provision Of Rub In Lieu Of Lc No. 122/C &Amp 145/C On Amethi Raebareli Lucknow Section.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 77726383
Reference
Number
TRD-16-SRDEE-LKO-2024
Tender Fee 0
EMD 57800
Tender Value
Place New Delhi
Link https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77726383/viewNitPdf_4730639.pdf
Start Date October 16, 2024 21:12
End Date

14/11/2024 ( Expired 203 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Read more
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Read more
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Read more
Construction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar

Construction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar

Read more
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata

Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata

Read more
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise