Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Breakdown Maintenance Of Hp, Lp Valves, Hp Heater Etc Of Turbine Of 5 X200 Mw, Btps, Obra
|
| Description |
Breakdown Maintenance Of Hp, Lp Valves, Hp&Amp#X0d
Heater Etc Of Turbine Of 5 X200 Mw, Btps, Obra
|
| Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
| Tender Id | 2024_RVUNL_981804_1 |
|
Reference Number |
OBR/B/OMC2/TMD1/6000006576 |
| Tender Fee | 1770 |
| EMD | 35000 |
| Tender Value | - |
| Place | 5X200 MW, BTPS, Obra |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1728157 |
| Start Date | December 09, 2024 23:30 |
| End Date |
Expired
24/12/2024
Expired 658 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of lp turbine lead diaphragms for unit-3,4 of tm division/stage-ii/btps
Supply of lp turbine lead diaphragms for unit-3,4 of tm division/stage-ii/btps
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 overhauling of hp lp valves and replacement of defective valves
Mtps i bm unit ii boiler pressure parts aoh 2026 overhauling of hp lp valves and replacement of defective valves
Read moreTtps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Read moreProcurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Procurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Read moreProcurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Read moreSupply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Read moreProcurement of hydraulic cylinder for hp control valve servomotor of drive turbine of tdbfp installed at 1x500 mw unit sgtps, mppgcl, birsinghpur.
Procurement of hydraulic cylinder for hp control valve servomotor of drive turbine of tdbfp installed at 1x500 mw unit sgtps, mppgcl, birsinghpur.
Read moreMtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210 mw atps anpara overhauling servicing of hp valves and actuators including replacement of hp drip drain line pipes replacement of 300 mm feed line control valve bf..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210 mw atps anpara overhauling servicing of hp valves and actuators including replacement of hp drip drain line pipes replacement of 300 mm feed line control valve bf..
Read moreof your Industry type