Tender Details

Particulars Details
Title
Hot Applied Thermoplastic Road Marking Material
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106540264
Reference
Number
10249470
Tender Fee 0
EMD 0
Tender Value -
Place Gorakhpur
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/122024/106540264/viewNitPdf_4790495.pdf

Start Date November 29, 2024 22:12
End Date
Expired 06/12/2024

Expired 675 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of portable tri-gas analyzer, make:endee/nova/applied techno systems

Supply of portable tri-gas analyzer, make:endee/nova/applied techno systems

Read more
Supply of control damper assembly for mill hot primary air of unit-xi boiler

Supply of control damper assembly for mill hot primary air of unit-xi boiler

Read more
Construction of table drain and roqad marking at parvath nagar junction via ht line road in ward number 232- madhapur circle-50, kpz, cmc

Construction of table drain and roqad marking at parvath nagar junction via ht line road in ward number 232- madhapur circle-50, kpz, cmc

Read more
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Read more
Construction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.

Construction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.

Read more
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.

Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.

Read more
Construction of syntheic athletic running track-6 lanes (earthworks and pavements work, synthetic surfacing works(6 lane running track), fininghing wrks(line marking), boundary and fencing work and steps for athletic players sitting) at sports school, tumkunta, shamirpet of medchal malkajgiri district, estimate cost: rs.244.00 lakhs, grant: dmf(t)

Construction of syntheic athletic running track-6 lanes (earthworks and pavements work, synthetic surfacing works(6 lane running track), fininghing wrks(line marking), boundary and fencing work and steps for athletic players sitting) at sports school, tumkunta, shamirpet of medchal malkajgiri district, estimate cost: rs.244.00 lakhs, grant: dmf(t)

Read more
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally

Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise