Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Implementation Of 3rd Party Field Quality Assurance For 400 Kv Koppal Ps Gadag Dc Line
|
| Description |
Implementation Of 3rd Party Filed Quality Assurance For 400 Kv Koppal Ps Gadag Dc Line
|
| Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
| Tender Id | 25580 |
|
Reference Number |
SR2/T/S-MISC/DOM/C00/25/04469 |
| Tender Fee | 2000 |
| EMD | 99000 |
| Tender Value | |
| Place | Karnataka |
| Link |
View Original Tender Notice
https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=eaaae201-46cc-47ba-b3a7-026153eb4b37 |
| Start Date | April 14, 2025 23:00 |
| End Date |
Expired
02/05/2025
Expired 400 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration work of collapsed 16 no. dc tower of 220kv orai-parichha ckt iii and 220 kv orai moth dc line due to heavy storm under etd-orai
Restoration work of collapsed 16 no. dc tower of 220kv orai-parichha ckt iii and 220 kv orai moth dc line due to heavy storm under etd-orai
Read moreForest clearance and demarcation of land for 400 kv gis substation kotdwar, distt-pauri garhwal
Forest clearance and demarcation of land for 400 kv gis substation kotdwar, distt-pauri garhwal
Read moreFor operation,maintenance work of different 33/11 kv substation and its associated line (33 kv, 11 kv, 0.4 kv,dtr) and redressal of consumer complaint under package of b)edsd mussoorie of eddnorth,dehradun through verious outer agencies for one year
For operation,maintenance work of different 33/11 kv substation and its associated line (33 kv, 11 kv, 0.4 kv,dtr) and redressal of consumer complaint under package of b)edsd mussoorie of eddnorth,dehradun through verious outer agencies for one year
Read moreSitc of 33 kv,3 pole,3 phase gang operated air break switch for replacement of worn out/damaged 33 kv air break switch near store subdivision for 33 kv ljhp-peernia transmission line
Sitc of 33 kv,3 pole,3 phase gang operated air break switch for replacement of worn out/damaged 33 kv air break switch near store subdivision for 33 kv ljhp-peernia transmission line
Read moreQuantum of works involved for replacement of old and jarjar wire of 33 kv overhead line of 33 kv kalukheda feeder of 33/11 s/s kalukheda and 11 kv bhawaniganj feeder bifurcation work of 33/11 kv s/s maurawan rural under edsd maurawan unnao
Quantum of works involved for replacement of old and jarjar wire of 33 kv overhead line of 33 kv kalukheda feeder of 33/11 s/s kalukheda and 11 kv bhawaniganj feeder bifurcation work of 33/11 kv s/s maurawan rural under edsd maurawan unnao
Read moreLaying of tower foundations erection of towers and stringing and sagging of conductor with earthwire for undergrounding of 66 kv oh line from 220 kv ss lalton kalan to 66 kv gill road ss at railway crossing on request of railway department
Laying of tower foundations erection of towers and stringing and sagging of conductor with earthwire for undergrounding of 66 kv oh line from 220 kv ss lalton kalan to 66 kv gill road ss at railway crossing on request of railway department
Read moreFor executing work of 66 kv line t off from 66kv ladhowal to gt road line for 66kv s/s bahadurke planning no. 128 cz 2025 26 annexure e rdss work
For executing work of 66 kv line t off from 66kv ladhowal to gt road line for 66kv s/s bahadurke planning no. 128 cz 2025 26 annexure e rdss work
Read moreTransmission line package tl03 associated with intra state transmission system for establishment of 3x500mva 400/220kv sub-station at humnabad in bidar district through tbcb route
Transmission line package tl03 associated with intra state transmission system for establishment of 3x500mva 400/220kv sub-station at humnabad in bidar district through tbcb route
Read moreDesign supply installation testing and commissioning of receiving cum auxiliary main sub stations including 750 volts dc 3rd rail traction system 33kv cable network ass tss and scada system for east west corridor of lucknow metro rail project
Design supply installation testing and commissioning of receiving cum auxiliary main sub stations including 750 volts dc 3rd rail traction system 33kv cable network ass tss and scada system for east west corridor of lucknow metro rail project
Read moreConstruction of 2no pps includes complete supply etc of 4x315mva 33/400 kv transformer, construction of 2nos bays of 400kv transmission lines for pps-i,ii each 33kv side metering, switchyards, control rooms civil (turnkey project) at bodana solarpark
Construction of 2no pps includes complete supply etc of 4x315mva 33/400 kv transformer, construction of 2nos bays of 400kv transmission lines for pps-i,ii each 33kv side metering, switchyards, control rooms civil (turnkey project) at bodana solarpark
Read moreof your Industry type