Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Chulliyar Dam Rectification Works To The Gallery Entrance Steps, Providing Rails Near Stilling Basin
|
| Description |
Dam Safety Works
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_579442_2 |
|
Reference Number |
IRR/PI/TR/4922/2022_5_1_1 |
| Tender Fee | 880 |
| EMD | 8424 |
| Tender Value | |
| Place | O/o Assistant Executive Engineer |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | June 21, 2023 22:30 |
| End Date |
Expired
29/06/2023
Expired 1078 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing and laying of filter media at seepage sport near rd 850 on d/s slope at kaushlya dam
Providing and laying of filter media at seepage sport near rd 850 on d/s slope at kaushlya dam
Read moreDrip phase ii part a completion works strengthening of hoisting pillars of penstock shutters safeguarding kip campus by providing fencing and compound wall strengthening of abutment wall of the dam enhancing basic facilities of kallada dam et
Drip phase ii part a completion works strengthening of&#x0d hoisting pillars of penstock shutters safeguarding kip&#x0d campus by providing fencing and compound wall strengthening of abutment wall of the dam enhancing basic facilities of kallada dam et
Read moreProviding internal electrification works for the installation of 06 six nos air conditioners in the computer lab to emrs khumulwng jirania west tripura
Providing internal electrification works for the installation of 06 six nos air conditioners in the computer lab to emrs khumulwng jirania west tripura
Read moreRenovation to pendrawan mip in komna block of nuapada district under dpiw (dam protection and improvement work) for the year 2025-26
Renovation to pendrawan mip in komna block of nuapada district under dpiw (dam protection and improvement work) for the year 2025-26
Read moreBalance work for providing of following fire safety equipments for the following for esic hospital, gorimedu, puducherry . part-(a): providing for firefighting system with connected allied works etc., part-(b): providing for automatic sprinkler system including fire extinguishers with connected allied works etc.,
Read moreTender for the work of package no rj-3-01/missing link/2021-22 repair work on laxmipura to arnia road under risk and cost within defect rectification period
Tender for the work of package no rj-3-01/missing link/2021-22 repair work on laxmipura to arnia road under risk and cost within defect rectification period&#x0d
Read moreProviding inspection vehicle for office of the assistant engineer (e)-ii cpwd, hinoo, ranchi during 2026-27. (ch. to contingencies of various running works under ranchi central electrical division-ii ranchi.)
Read moreTo provide the new connections and other works under full deposit scheme edd afjalgarh running
To provide the new connections and other works under full deposit scheme edd afjalgarh running
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gplus 1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabili
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gpl1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabilitation 2025-2026 pappired
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 1 to 80 houses (8 houses (g 1) -10 units - nw side) including the leveling of site pkg.no. tn04-01 / srilankan rehabilitatio
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 1 to 80 houses (8 houses (g p1) -10 units - nw side) including the leveling of site pkg.no. tn04-01 / srilankan rehabilitation camp2025-2026 pappi
Read moreof your Industry type