Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1.Construction Of Slaughter House In Industrial Area, Phase 1, Chandigarh. 2. Construction Of Cattle Pond At Industrial Area, Phase 1, Chandigarh.(Testing Of Soil Bearing Capacity And Digital Survey Of Both Sites)
|
| Description |
1.Construction Of Slaughter House In Industrial Area, Phase 1, Chandigarh. 2. Construction Of Cattle Pond At Industrial Area, Phase 1, Chandigarh.
(Testing Of Soil Bearing Capacity And Digital Survey Of Both Sites)
|
| Organisation | Government of Chandigarh (U.T) |
| Tender Id | 2023_MCC_75354_3 |
|
Reference Number |
2023/R2/44 |
| Tender Fee | 0 |
| EMD | 2500 |
| Tender Value | - |
| Place | Executive Engineer Roads Division No 2 MC Chd |
| Link |
View Original Tender Notice
https://etenders.chd.nic.in |
| Start Date | August 17, 2023 21:30 |
| End Date |
Expired
24/08/2023
Expired 1149 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for structural hydraulic design of various hydraulic structures, including soil investigation topographical survey geotechnical investigation formulation of both the reports duly vetted by diqc nit iit for various components f
Consultancy services for structural hydraulic design of various hydraulic structures, including soil investigation topographical survey geotechnical investigation formulation of both the reports duly vetted by diqc nit iit for various components f
Read more1.construction of slaughter house in industrial area, phase-1, chandigarh. 2. construction of cattle pond at industrial area, phase-1, chandigarh.(testing of soil bearing capacity and digital survey of both sites)
1.construction of slaughter house in industrial area, phase-1, chandigarh. 2. construction of cattle pond at industrial area, phase-1, chandigarh. (testing of soil bearing capacity and digital survey of both sites)
Read moreCustom bid for services - cat dcvg cips ac dc interference and soil resistivity survey of both ml
Read more
Survey and soil investigation for construction of infrastructure for mafi phase ii at af stn carnicobar
Survey and soil investigation for construction of infrastructure for mafi phase ii at af stn carnicobar
Read moreSurvey and soil investigation for construction for infrastructure for mafi phase ii at af stn carnicobar
Survey and soil investigation for construction for infrastructure for mafi phase ii at af stn carnicobar
Read moreRfp for providing service and executing geotechnical survey and soil testing of atal innovation studio sites at udaipur, bharatpur and bikaner
Rfp for providing service and executing geotechnical survey and soil testing of atal innovation studio sites at udaipur, bharatpur and bikaner
Read moreCleaning of both side flank and road side drain and disposal of garbage in 1st,2nd, industrial estate, 3rd phase, 4th phase, 5th phase, 6th phase, 7th phase, large sector of adityapur industrial area , jiada
Cleaning of both side flank and road side drain and disposal of garbage in 1st,2nd, industrial estate, 3rd phase, 4th phase, 5th phase, 6th phase, 7th phase, large sector of adityapur industrial area , jiada
Read moreCarry out the topographical survey and demarcation of different sites having different areas and location in chandigarh (ch. to mtc. of road under r-ii, sub division, chandigarh).
Carry out the topographical survey and demarcation of different sites having different areas and location in chandigarh (ch. to mtc. of road under r-ii, sub division, chandigarh).
Read moreSupply and laying of concrete survey stones in puthisseri central village phase-ii lands in palakkad
Supply and laying of concrete survey stones in puthusseri central village phase-ii lands in palakkad
Read moreBiennial maintenance of ash slurry line extension at different dp and dp changeover (both phase -1 and phase -2) inside ash pond of sgtpp
Biennial maintenance of ash slurry line extension at different dp and dp changeover (both phase -1 and phase -2) inside ash pond of sgtpp
Read moreof your Industry type