Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Removal, Repair, Installation And Trials Of Auxiliary Cooling And Chilled Water Systems Of Ekm Class Submarine
|
| Description |
Removal, Repair, Installation And Trials Of Auxiliary Cooling And Chilled Water Systems Of Ekm Class Submarine
|
| Organisation | Hindustan Shipyard Limited | SHIP BUILDING OUTSOURCING |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 5 Lakh |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 16, 2026 21:30 |
| End Date |
Open
30/10/2026
13 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Service for chemical treatment of cooling water - cooling towers induced draft cooling tower (idct) chemical dosing plan, periodic testing of cooling water parameters, installation/maintenance of dosing systems (if applicable), adjustment of treatm..
Service for chemical treatment of cooling water - cooling towers induced draft cooling tower (idct) chemical dosing plan, periodic testing of cooling water parameters, installation/maintenance of dosing systems (if applicable), adjustment of treatm..
Read moreRepair and overhauling service - repair and replacement of lp air and dm water cooling pipelines in submarine battery commissioning hall as per scope of work no buyer premises
Repair and overhauling service - repair and replacement of lp air and dm water cooling pipelines in submarine battery commissioning hall as per scope of work no buyer premises
Read moreIn-line multipath full bore ultrasonic gas flow metering systems(12” meter size & class 900) ft-3600,in-line multipath full bore ultrasonic gas flow metering systems(16” meter size & class 300) ft-1160
In-line multipath full bore ultrasonic gas flow metering systems(12” meter size & class 900) ft-3600,in-line multipath full bore ultrasonic gas flow metering systems(16” meter size & class 300) ft-1160
Read moreDouble player virtual module of torpedo tube of ekm,double player virtual module of escape tower system of ekm,double virtual module of escape facility of kalvari class,vr work station computer with all accessories,vr headset meta quest 3,wall mounted projector 4k,joysticks for vr module
Double player virtual module of torpedo tube of ekm,double player virtual module of escape tower system of ekm,double virtual module of escape facility of kalvari class,vr work station computer with all accessories,vr headset meta quest 3,wall mounted projector 4k,joysticks for vr module
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit annual service contract for auxiliary boiler in cgp, at rcf thal, maharashtra service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit annual service contract for auxiliary boiler in cgp, at rcf thal, maharashtra service provider
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - onboard p15a class of ships irc case for repairs/ overhaul of ac compressor and evaporator fitted onboard p15a class of ships service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - onboard p15a class of ships irc case for repairs/ overhaul of ac compressor and evaporator fitted onboard p15a class of ships service provider
Read moreCircuit breaker 3 pole for tm blower and oil cooling unit transformer/converter along with auxiliary contact (2 no type) as per clw spec. no. clw/es/3/0096 (alt.-l) (63 amp)
Circuit breaker 3 pole for tm blower and oil cooling unit transformer/converter along with auxiliary contact (2 no type) as per clw spec. no. clw/es/3/0096 (alt.-l) (63 amp)
Read moreTtps operation circle cad unit iv and v overhauling of heat exchangers 4a, 4b, 4c, 5a, 5b and 5c, cleaning and painting of auxiliary cooling water tank of unit iv and v acw system
Ttps operation circle cad unit iv and v overhauling of heat exchangers 4a, 4b, 4c, 5a, 5b and 5c, cleaning and painting of auxiliary cooling water tank of unit iv and v acw system
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit tar sludge removal from catch pits,ccs, eq tank and inside equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit tar sludge removal from catch pits,ccs, eq tank and inside equipment service provider
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - onboard ekm/ssk submarines at naval dockyard mumbai repair rate contract for two years and extendable one more year of acoustic emission testing (aet) of hp air and hyd..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - onboard ekm/ssk submarines at naval dockyard mumbai repair rate contract for two years and extendable one more year of acoustic emission testing (aet) of hp air and hyd..
Read moreof your Industry type