Tender Details

About Tender

🏗️ Invitation For Loss Reduction Work Bids In Kargil District 🏗️ Power Grid Corporation Of India Limited, Under The Central Government's Ministry/Department, Invites Bids For The Execution Of Loss Reduction Work Under The Rural Electrification Corporation's Rural Distribution System Strengthening Scheme (Rdss) In Kargil District, Ut Of Ladakh. 📅 Bid Submission Deadline: July 29, 2024, 11:00 Am Tender Fee: Inr 25,000 Earnest Money Deposit (Emd): Inr 23,86,200 This Project Is Part Of The Distribution Infrastructure Works Of Ladakh's Power Development Department (Lpdd) Under The Rdss. Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, Adhering To The Project's Specifications And Timelines. Keywords: Loss Reduction Work, Rdss, Kargil District, Power Grid Corporation Of India Limited, Rural Electrification Corporation, Ladakh Power Development Department, Tender, Bid, Ut Of Ladakh
Particulars Details
Title
Loss Reduction Work Under Rdss In Kargil District
Description
Loss Reduction Work Under Rdss In Kargil District Under Implementation Of Distribution Infrastructure Works Of Lpdd Under Rdss In The Districts Of Leh And Kargil Of Ut Of Ladakh Re Tender
Organisation Power Grid Corporation of India Limited | Central Govt. Ministry/Department
Tender Id 24191
Reference
Number
CC/NT/W-MISC/DOM/A04/24/08107
Tender Fee 25000
EMD 2.39 Crore
Tender Value
Place Kargil
Link https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=f7771fb6-8515-4ee7-9b06-041a39c1109a
Start Date June 13, 2024 03:30
End Date

23/08/2024 ( Expired 313 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work

Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Agar-09

Licensing of co-branding and inside advertising rights of five (5) no. metro stations of agra metro rail-priority &#x0d corridor in upmrc network as per scope of work mentioned in tender

Read more
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise