Tender Details
Particulars | Details |
---|---|
Title |
H2 S Detection Tube (Range 1 To 30 Ppm),H2 S Detection Tube (Range 2 To 20 Ppm),H2 S Detection Tube (R
|
Description |
|
Organisation | NA | Ministry of Petroleum and Natural Gas |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 09, 2025 15:25 |
End Date |
27/06/2025 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreAAAAAAAAAA
Login to viewDi of 400
 kv silchar-imphal
 (from loc no 64 to
 67) and 400
 kv silchar-melriat
 transmission lines
 (from
 loc65 and 68,70 and 72,and
 122 and 125) of power
 grid corporation of
 india on supervision
 basis under nhidcl.
Read moreRising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read more8603 spl repair to bldg no et-17, et - 20 and provn of certain revenue and minor works at old nda complex, aipt in the area of age b/r-ii under ge (central) pune
8603 spl repair to bldg no et-17, et - 20 and provn of certain revenue and minor works at old nda complex, aipt in the area of age b/r-ii under ge (central) pune
Read more1. stress heat resistant bars, spec- hw10673 rev 03, dia- 20 mm,2. stress heat resistant bars, spec
Read more
6amp 1 way switch,6 amp 3 pin socket,6 amp 3 pin top,5 amp 2 pin top,20 amp 1 way switch,20 amp 3 p
Read more
Construction of c.c. road from pintu yadav shop in ward no. 1 from nagara dhosi main road to kedar yadav house via hari yadav tube well.
Construction of c.c. road from pintu yadav shop in ward no. 1 from nagara dhosi main road to kedar yadav house via hari yadav tube well.
Read moreof your Industry type