Tender Details
About Tender
🏭 Tender Announcement For Ttps Es Instn I Overhauling Works 🛠️ Tneb Limited, State Government Undertaking, Invites Tenders From Experienced Vendors For The Overhauling Of Sample Coolers, Including Painting And The Replacement Of High Pressure Valves In The Sample Lines Of Unit I At Ttps. This Project Is Scheduled To Commence During The Annual Overhaul For The Year 2024 2025. 📅 Submission Deadline: July 18, 2024, 2:00 Pm Tenderers Are Required To Submit An Earnest Money Deposit (Emd) Of Inr 400. No Tender Fee Is Applicable. Interested Parties Should Provide Detailed Proposals, Including Methodology, Timelines, And Cost Estimates, To Meet The Project's Requirements. Keywords: Tneb Limited, Ttps Es Instn I, Overhauling, Sample Coolers, High Pressure Valves, Annual Overhaul, State Government Undertaking, Tender, EmdParticulars | Details |
---|---|
Title |
Ttps Es Instn I Overhauling Of 9 Nos Sample Coolers Painting And Replacement Of 6 Nos 1 2 Defective High Pressure Valves In Sample Lines Of Unit I During The Period Of Annual Overhaul For The Year Of 2024 25
|
Description |
Ttps Es Instn I Overhauling Of 9 Nos Sample Coolers Painting And Replacement Of 6 Nos 1 2 Defective High Pressure Valves In Sample Lines Of Unit I During The Period Of Annual Overhaul For The Year Of 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_459596_1 |
Reference Number |
CE/SE/ES /TTPS /No.172/2024-25 |
Tender Fee | 0 |
EMD | 400 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546297 |
Start Date | July 03, 2024 19:30 |
End Date |
18/07/2024 ( Expired 304 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreTtps operation circle mpm ii unit iv overhauling of seal air fans during forthcoming annual overhaul
Ttps operation circle mpm ii unit iv overhauling of seal air fans during forthcoming annual overhaul
Read moreTtps operation circle mpm ii unit v overhauling of seal air fans during forthcoming annual overhaul
Ttps operation circle mpm ii unit v overhauling of seal air fans during forthcoming annual overhaul
Read moreTtps operation circle mpm ii unit iv overhauling of gravimetric feeder, bunker gates, hag, cag, had, cad, and painting of cold air duct and feeder during the forthcoming overhaul
Ttps operation circle mpm ii unit iv overhauling of gravimetric feeder, bunker gates, hag, cag, had, cad, and painting of cold air duct and feeder during the forthcoming overhaul
Read moreTtps operation circle cad annual maintenance of unit i lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 2000kva, acwph service transformer i during the forth coming annual overhaul period 2025 to 2026 in acwph
Ttps operation circle cad annual maintenance of unit i lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 2000kva, acwph service transformer i during the forth coming annual overhaul period 2025 to 2026 in acwph
Read moreTtps operation circle cad annual maintenance of unit ii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer ii during the forth coming annual overhaul period 2025 to 2026 in acwph
Ttps operation circle cad annual maintenance of unit ii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer ii during the forth coming annual overhaul period 2025 to 2026 in acwph
Read moreTtps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2025 to 2026 in acwph
Ttps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2025 to 2026 in acwph
Read moreMtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Read moreMtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Read moreNctps i es circle em i dn s dn i replacement of 6 nos defective 245 kv sf6 breaker pole assembly 3 nos existing 245kv capacitor voltage transformer (cvt) 3 nos existing 245kv current transformer (ct) 3 nos isolators 24nos existing las in 230 k
Nctps i es circle em i dn s dn i replacement of 6 nos defective 245 kv sf6 breaker pole assembly 3 nos existing 245kv capacitor voltage transformer (cvt) 3 nos existing 245kv current transformer (ct) 3 nos isolators 24nos existing las in 230 k
Read moreof your Industry type