Tender Details
Particulars | Details |
---|---|
Title |
41248 Architect Ia Total T3 Calibrator Kit Abbott .One Pack Contains 2 Vials Of 4ml Each Of Abbott Architect Ia Total T3 Calibrator Kit.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106567870 |
Reference Number |
H1245268 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/012025/106567870/viewNitPdf_4822869.pdf |
Start Date | January 02, 2025 21:49 |
End Date |
10/01/2025 ( Expired 103 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operational contract of 2 nos. x 315 tr capacity central air conditioning plant in three shifts with one operator and one ac helper in each shift at bharatratna dr. babasaheb ambedkar municipal gen. hospital, kandivali (w) for the period of one year
Operational contract of 2 nos. x 315 tr capacity central air conditioning plant in three shifts with one operator and one ac helper in each shift at bharatratna dr. babasaheb ambedkar municipal gen. hospital, kandivali (w) for the period of one year
Read moreGeneral-rm 2024-25-rc1-cluster 1 - one year running contract for various pwd roads under roads section pulincunnu -zone 1-in alappuzha district 2 road stretches for a total length of 6.80 km.-general civil work
General-rm 2024-25-rc1-cluster 1 - one&#x0d year running contract for various pwd roads&#x0d under roads section pulincunnu -zone 1-in&#x0d alappuzha district 2 road stretches for a total&#x0d length of 6.80 km.-general civil work
Read moreGeneral-general -routine maintenance 2024-25 rc1-cluster 1- one year running contract for various pwd roads under roads section konni - zone 2 in pathanamthitta dist- 4 road stretches for a total length of 15.606 km-work-general civil work
General-general -routine&#x0d maintenance 2024-25 rc1-cluster 1-&#x0d one year running contract for various pwd&#x0d roads under roads section konni - zone 2&#x0d in pathanamthitta dist- 4 road stretches for a&#x0d total length of 15.606 km-work-general civil&#x0d work
Read moreKit for pantograph throttle valve rdso s str no. rdso/2008/el/str/ 0049 (rev. 2) for pantograph type ir 01 comprising of 4 items 4 nos. /set to m/s. gsec s drg. nos. as follows duly approved by rdso similar to (1) ring type r no. 7 drg. no. - gsec/panto/042 = 1 no. (2) joint for valve drg. no. gsec/panto/100 = 1 no. (3) piston ring drg. no. gsec/panto/063 = 1 no. (4) joint drg. no. gsec/panto/111 = 1 no. (total qty. = 4 nos./set) or for pantograph type pan 01 comprising of 4 items 4 nos. /set
For complete deion and other details, please refer to tender
Read moreGeneral-rm 2024- 25-rc1-cluster 1-one year running contract for various pwd roads under roads section cherthala -zone 2- in alappuzha district 2 road stretches for a total length of 6.82 km-general civil work
General-rm 2024- 25-rc1-cluster 1-one&#x0d year running contract for various pwd roads&#x0d under roads section cherthala -zone 2- in&#x0d alappuzha district 2 road stretches for a total&#x0d length of 6.82 km-general civil work
Read moreGeneral-rm 2024-2025 rc1 cluster-1 - one year running contract for various pwd roads under roads section mallappally zone 2- in pathanamthitta district- 5 road stretches for a total length of 21.614 km-general civil work
General-rm 2024-2025 rc1 cluster-1 -&#x0d one year running contract for various pwd&#x0d roads under roads section mallappally zone 2-&#x0d in pathanamthitta district- 5 road stretches for a&#x0d total length of 21.614 km-general civil work
Read moreGeneralrm 2024 25 rc 2 phase 2 zone ii one year running contract for various pwd roads under roads section cherthala in alappuzha district 13 road streches for a total length of 55.308km
General rm 2024 25 rc 2 phase&#x0d 2 zone ii one year running contract for various&#x0d pwd roads under roads section cherthala in&#x0d alappuzha district 13 road streches for a total&#x0d length of 55.308km general civil work
Read moreUpgradation and construction of ambua to mp/gujrat border road section of nh-56 total length 27.59km to 2 lane with paved shoulder configuration along with one time improvement in 5.88 km length in the state of madhya pradesh on epc mode
Upgradation and construction of ambua to mp/gujrat border road section of nh-56 total length 27.59km to 2 lane with paved shoulder configuration along with one time improvement in 5.88 km length in the state of madhya pradesh on epc mode
Read moreGeneral rm rc1 2024-25 one year running contract for various pwd roads under road section kaduthuruthy (zone 2) in kottayam district, 3 road stretches for a total length of 7.240 km-rc 24-25 various pwd roads under road section kaduthuruthy (zone 2)
Supply and filling with 36mm for pot holes tack coat&#x0d cgps scarifying gsb dismantiling interlocking tile maintenance of earthen shoulder man mazdoor excavator tipper dlp board rcc m20 pcc hysd steel bar ri etc
Read moreof your Industry type