Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling,Part Changing,Checking,Replacement, Overhauling And Re Erection Of Parts Of Gyratory Crusher At Chp,Bina Project As And When Required For A Period Of Two Years
|
| Description |
Dismantling,Part Changing,Checking,Replacement, Overhauling And Re Erection Of Parts Of Gyratory Crusher At Chp,Bina Project As And When Required For A Period Of Two Years
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_343078_1 |
|
Reference Number |
B/EM/eTender/2025-26/31 Dt. 02.09.2025 |
| Tender Fee | 0 |
| EMD | 39900 |
| Tender Value | - |
| Place | Bina Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=355632 |
| Start Date | September 04, 2025 19:30 |
| End Date |
Expired
15/09/2025
Expired 396 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing/overhauling of primary gyratory crusher kb 63-75 installed at central chp, nigahi project
Repairing/overhauling of primary gyratory crusher kb 63-75 installed at central chp, nigahi project
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreComprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada
Comprehensive annual maintenance contract(camc) for dismantling and laying of different dia ms/gi pipes, valves etc. as and when required basis for smooth mine dewatering and fire quenching for a period of 02(two) year at sirka ocp under argada
Read moreTaking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Read moreOverhauling of gyratory crusher of chp including replacement of eccentric with gear on as and when required basis
Overhauling of gyratory crusher of chp including replacement of eccentric with gear on as and when required basis
Read moreOverhauling/part changing/servicing/maintenance and repair of primary gyratory crusher no. 2 and old crusher (pgc-1500h) installed at amlohri chp.
Overhauling/part changing/servicing/maintenance and repair of primary gyratory crusher no. 2 and old crusher (pgc-1500h) installed at amlohri chp.
Read moreOverhauling/part changing/servicing/maintenance and repair of primary gyratory crusher no. 2 and old crusher (pgc-1500h) installed at amlohri chp
Overhauling/part changing/servicing/maintenance and repair of primary gyratory crusher no. 2 and old crusher (pgc-1500h) installed at amlohri chp
Read moreTransportation of head shaft assembly of primary gyratory crusher from crusher complex of dudhichua chp to crusher complex at amlohri chp.
Transportation of head shaft assembly of primary gyratory crusher from crusher complex of dudhichua chp to crusher complex at amlohri chp.
Read moreOverhauling/part changing/servicing/maintenance and repair of primary gyratory crusher no. 1, no. 2 and old crusher (pgc-1500h) installed at amlohri chp.
Overhauling/part changing/servicing/maintenance and repair of primary gyratory crusher no. 1, no. 2 and old crusher (pgc-1500h) installed at amlohri chp.
Read moreComplete overhauling of crusher by repairing/part changing/ servicing/ maintenance of primary gyratory crusher 38 (capacity 1200 tph) installed at section-1 of chp at jayant, ncl.
Complete overhauling of crusher by repairing/part changing/ servicing/ maintenance of primary gyratory crusher 38 (capacity 1200 tph) installed at section-1 of chp at jayant, ncl.
Read moreof your Industry type