Tender Details

Particulars Details
Title
02/Aee(c)/Bhilai/2023 24
Description
Construction Of Permanent Campus Of Iit Bhilai At Kutelabhata, Durg, Chhattisgarh, Phase 1 (Stage 1) Sh: Removing And Refixing Of 2 Door Dw3 And Dw2 A In Cpf Building To Allow Shifting Of Machine In Workshop 3 Of Cpf Building.
Organisation Central Public Works Department (CPWD) | Central Govt. Ministry/Department
Tender Id 65065
Reference
Number
02/AEE(C)/Bhilai/2023-24
Tender Fee 0
EMD 0
Tender Value
Place
Link https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642436353036352430322f4145452843292f4268696c61692f323032332d3234
Start Date January 11, 2024 23:59
End Date

20/01/2024 ( Expired 533 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

Read more
Special repair of pump chambers including development of water works area construction of pathways and other related works in urban estate phase 1 2 3 and 4 patiala

Special repair of pump chambers including development of water works area construction of pathways and other related works in urban estate phase 1 2 3 and 4 patiala

Read more
Lt/c132-000-jx-mr-6810/01 - desalter package for epcm, supply and associated services for phase -2 revamp of 2 stage desalter system in cdu 3 in bpcl kochi refinery (bpcl)

Desalter package for epcm, supply and associated services for phase -2 revamp of 2 stage desalter system in cdu 3 in bpcl kochi refinery (bpcl)

Read more
Consultancy services for green building certification of 13 elevated metro stations in package 1 and 2 of phase 2a corridor of bangalore metro under igbc mrts rating.

Consultancy services for green building&#x0d certification of 13 elevated metro stations in package 1 and 2 of phase 2a&#x0d corridor of bangalore metro under igbc mrts rating.

Read more
Special repair maintenance required for extention of 3 phase line in block 1 at new secretariat building agartala for installation of eleven nos 4 tr vertical ac machines in ga p and t law dept home dept and in lounge attached with conference hall

Special repair maintenance required for extention of 3 phase line in block 1 at new secretariat building agartala for installation of eleven nos 4 tr vertical ac machines in ga p and t law dept home dept and in lounge attached with conference hall

Read more
Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs 649/5514 including plc based amf panel, complete cabling, const. of c.c. foundation and other associated works complete at tw in zone-1 and 2 of npp muzaffarnagar

Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs 649/5514 including plc based amf panel, complete cabling, const. of c.c. foundation and other associated works complete at tw in zone-1 and 2 of npp muzaffarnagar

Read more
Invitation to pre-tender meet for composite works for construction of stage (phase 2 and 3) of iim nagpur campus

Invitation to pre-tender meet for composite works for construction of stage (phase 2 and 3) of iim nagpur campus

Read more
Replacement of old light fittings providing additional 3 phase 1 phase power points and rewiring of light points in wl 217 in academic area as per user required in the campus at iit kanpur

Replacement of old light fittings providing additional 3 phase 1 phase power points and rewiring of light points in wl 217 in academic area as per user required in the campus at iit kanpur

Read more
69(2)/ae-3/ii/2025/68

A/r and m/o for national institute of siddha at chennai for the year 2024-25.sh- removing and refixing the existing aluminium partition in yoga hall of new opd and ac section adblock at nis campus, tambaram, chennai -47

Read more
Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs-649-5514 including plc based amf panel, complete cabling and other associated works complete in all respect at tubewells in zone-1 and 2 of npp muzaffarnagar

Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs-649-5514 including plc based amf panel, complete cabling and other associated works complete in all respect at tubewells in zone-1 and 2 of npp muzaffarnagar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise