Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
02/Aee(c)/Bhilai/2023 24
|
Description |
Construction Of Permanent Campus Of Iit Bhilai At Kutelabhata, Durg, Chhattisgarh, Phase 1 (Stage 1) Sh: Removing And Refixing Of 2 Door Dw3 And Dw2 A In Cpf Building To Allow Shifting Of Machine In Workshop 3 Of Cpf Building.
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id | 65065 |
Reference Number |
02/AEE(C)/Bhilai/2023-24 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | |
Link | https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642436353036352430322f4145452843292f4268696c61692f323032332d3234 |
Start Date | January 11, 2024 23:59 |
End Date |
20/01/2024 ( Expired 533 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreSpecial repair of pump chambers including development of water works area construction of pathways and other related works in urban estate phase 1 2 3 and 4 patiala
Special repair of pump chambers including development of water works area construction of pathways and other related works in urban estate phase 1 2 3 and 4 patiala
Read moreLt/c132-000-jx-mr-6810/01 - desalter package for epcm, supply and associated services for phase -2 revamp of 2 stage desalter system in cdu 3 in bpcl kochi refinery (bpcl)
Desalter package for epcm, supply and associated services for phase -2 revamp of 2 stage desalter system in cdu 3 in bpcl kochi refinery (bpcl)
Read moreConsultancy services for green building certification of 13 elevated metro stations in package 1 and 2 of phase 2a corridor of bangalore metro under igbc mrts rating.
Consultancy services for green building
 certification of 13 elevated metro stations in package 1 and 2 of phase 2a
 corridor of bangalore metro under igbc mrts rating.
Read moreSpecial repair maintenance required for extention of 3 phase line in block 1 at new secretariat building agartala for installation of eleven nos 4 tr vertical ac machines in ga p and t law dept home dept and in lounge attached with conference hall
Special repair maintenance required for extention of 3 phase line in block 1 at new secretariat building agartala for installation of eleven nos 4 tr vertical ac machines in ga p and t law dept home dept and in lounge attached with conference hall
Read moreSitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs 649/5514 including plc based amf panel, complete cabling, const. of c.c. foundation and other associated works complete at tw in zone-1 and 2 of npp muzaffarnagar
Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs 649/5514 including plc based amf panel, complete cabling, const. of c.c. foundation and other associated works complete at tw in zone-1 and 2 of npp muzaffarnagar
Read moreInvitation to pre-tender meet for composite works for construction of stage (phase 2 and 3) of iim nagpur campus
Invitation to pre-tender meet for composite works for construction of stage (phase 2 and 3) of iim nagpur campus
Read moreReplacement of old light fittings providing additional 3 phase 1 phase power points and rewiring of light points in wl 217 in academic area as per user required in the campus at iit kanpur
Replacement of old light fittings providing additional 3 phase 1 phase power points and rewiring of light points in wl 217 in academic area as per user required in the campus at iit kanpur
Read more69(2)/ae-3/ii/2025/68
A/r and m/o for national institute of siddha at chennai for the year 2024-25.sh- removing and refixing the existing aluminium partition in yoga hall of new opd and ac section adblock at nis campus, tambaram, chennai -47
Read moreSitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs-649-5514 including plc based amf panel, complete cabling and other associated works complete in all respect at tubewells in zone-1 and 2 of npp muzaffarnagar
Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs-649-5514 including plc based amf panel, complete cabling and other associated works complete in all respect at tubewells in zone-1 and 2 of npp muzaffarnagar
Read moreof your Industry type