| Particulars | Details |
|---|---|
| Title |
Unloading And Storage Of 61 Mt (79 No.) 120 Lbs 40 Feet Rail Pole At Substation Under Construction At Chand Kuiya For Shifting Of 33/11 Kv Golakdih Substation.
|
| Description |
Unloading And Storage Of 61 Mt (79 No.) 120 Lbs 40 Feet Rail Pole At Substation Under Construction At Chand Kuiya For Shifting Of 33/11 Kv Golakdih Substation.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_292621_1 |
|
Reference Number |
BCCL/BA-IX/ENM/23-24/193 02/11/2023 |
| Tender Fee | - |
| EMD | 800 |
| Tender Value | - |
| Place | BASTACOLLA AREA ENM DEPARTMENT. |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 03, 2023 14:30 |
| End Date |
Expired
16/11/2023
Expired 1066 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Unloading and storage of 61 mt (79 no.) 120 lbs 40 feet rail pole at substation under construction at chandkiuya for shiftingof 33/11kv golakdih substation.
Unloading and storage of 61 mt (79 no.) 120 lbs 40 feet rail pole at substation under construction at chandkiuya for shiftingof 33/11kv golakdih substation.
Read moreUnloading and storage of 29 mt (38 no) 120 lbs 40 feet rail pole at substation under construction at chandkuiya for shifting of 33/11kv golakdih substation.
Unloading and storage of 29 mt (38 no) 120 lbs 40 feet rail pole at substation under construction at chandkuiya for shifting of 33/11kv golakdih substation.
Read morePreventive maintenance of 11 kv overhead line kuiya feeder under golakdih sub station 33/11kv of bastacolla area.
Preventive maintenance of 11 kv overhead line kuiya feeder under golakdih sub station 33/11kv of bastacolla area.
Read moreSupply and fixing earth leakage relay in 11kv vcb at golakdih 33kv/11 kv substation.
Supply and fixing earth leakage relay in 11kv vcb at golakdih 33kv/11 kv substation.
Read morePartial repairing gas kit changing stud and bushes and oil filteration of 11kv/440volt 750 kva lighting transformer of golakdih substation under kocp.
Partial repairing gas kit changing stud and bushes and oil filteration of 11kv/440volt 750 kva lighting transformer of golakdih substation under kocp.
Read moreTc section taliparamba-upgradation of 33kv substation pariyaram to 110kv level-erection of lbs and laying of 11kv cables
Tc section taliparamba-upgradation of 33kv substation pariyaram to 110kv level-erection of lbs and laying of 11kv cables
Read morePartial repairing gas kit changing stud and bushes of 11kv, 440volt sl. no 0812, 750 kva lighting transformer of golakdih substation under kuya ocp..
Partial repairing gas kit changing stud and bushes of 11kv, 440volt sl. no 0812, 750 kva lighting transformer of golakdih substation under kuya ocp..
Read morePartial repairing cork sheet changing stud and bushes and etc of 5000/7500 kva/33kv/11kv power transformer make andreyule at 33 kv golakdih substation.
Partial repairing cork sheet changing stud and bushes and etc of 5000/7500 kva/33kv/11kv power transformer make andreyule at 33 kv golakdih substation.
Read moreErection of earth wires for providing earth continuity for 11kv incoming line from kdh substation, 3.3kv face pump feeder, 3.3kv 32 no. pump feeder, 3.3kv shovel feeder, 3.3kv mohan nagar, 11kv township feeder, 3.3 kv crusher feeder and 11kv rail wb
Erection of earth wires for providing earth continuity for 11kv incoming line from kdh substation, 3.3kv face pump feeder, 3.3kv 32 no. pump feeder, 3.3kv shovel feeder, 3.3kv mohan nagar, 11kv township feeder, 3.3 kv crusher feeder and 11kv rail wb
Read moreDismantling of already laid 30 lbs rail line, sleepers from incline no 1 upto 9l/1dw and its loading, transporting and stacking at surface/ idle galleries in underground just 2 days before marching of lhcm package and loading, transporting, unloading
Dismantling of already laid 30 lbs rail line, sleepers from incline no 1 upto 9l/1dw and its loading, transporting and stacking at surface/ idle galleries in underground just 2 days before marching of lhcm package and loading, transporting, unloading
Read moreof your Industry type