Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
E1/T 07/Smart Meters/Electrical/2025 Mm.
|
Description |
Supply Of 196 Nos. Of Electrical Smart Meters (111 Nos Of Three Phase Whole Current Smart Meters, 76 Nos Of Lt Ct Smart Meters And 9 Nos. Of Ht Ct Smart Meters)
|
Organisation | Cochin Port Trust | Central Govt. Ministry/Department |
Tender Id | 2025_COPT_792600_1 |
Reference Number |
E1/T-07/SMART METERS/ELECTRICAL/2025-MM |
Tender Fee | 0 |
EMD | 41220 |
Tender Value | |
Place | Willingdon Island |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1097062 |
Start Date | March 19, 2025 00:00 |
End Date |
09/04/2025 ( Expired 86 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Draft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Draft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Read moreRate contract for supply, erection, testing and commissioning of 11kv ct/pt combined metering unit alongwith trivector meter and 3 phase 4 wire prodigy meter at various distribution transformers under electric division-i parade jammu
Rate contract for supply, erection, testing and commissioning of 11kv ct/pt combined metering unit alongwith trivector meter and 3 phase 4 wire prodigy meter at various distribution transformers under electric division-i parade jammu
Read moreRepair/ maint of borewell redevelopping, switch gear dol starter, three phase starter, contactor, motor rewinding, pumps, centrifugal pump under zone 1c area under age em i and repairs / renewal of lt oh line, lt ug cable, lt panel, street lights and
Repair/ maint of borewell redevelopping, switch gear dol starter, three phase starter, contactor, motor rewinding, pumps, centrifugal pump under zone 1c area under age em i and repairs / renewal of lt oh line, lt ug cable, lt panel, street lights and
Read moreSupply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreSurvey, supply, transportation, carriage, erection, testing and commissioning for 1 grievance of sh. ajay sharma 2creation of 25 kva ss ht/lt at w. no. 07 busnote3.creation of ss at w.no 3 kunsote 4.creation at naman 5. shifting of ht line mand ut
Creation of ss, ht ,lt line and shifting of line
Read moreLabour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Labour charges for laying of 166 mtrs 3corex150 sqmm aluminum armored 6.35kv (ue)/11kv (e) ht power cable from phase ii 6.6kv panel to auxiliary power transformer#4, termination work in both ends and hot oil circulation in respect of electrical maint
Read moreProvn of perimeter security lights/flood light provn of certain b/r and e/m works provn of three phase power supply for ups and acs of udaan improvemrnt of certain toilets and allied works at smc provn of geyser exhaust fan ceiling fans at certain pl
Provn of perimeter security lights/flood light provn of certain b/r and e/m works provn of three phase power supply for ups and acs of udaan improvemrnt of certain toilets and allied works at smc provn of geyser exhaust fan ceiling fans at certain pl
Read moreLt/c132-000-jx-mr-6810/01 - desalter package for epcm, supply and associated services for phase -2 revamp of 2 stage desalter system in cdu 3 in bpcl kochi refinery (bpcl)
Desalter package for epcm, supply and associated services for phase -2 revamp of 2 stage desalter system in cdu 3 in bpcl kochi refinery (bpcl)
Read moreSupply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at khudwan, damuni, under the jurisdiction of electric division div.-i (jpdcl) jammu
Supply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at khudwan, damuni, under the jurisdiction of electric division div.-i (jpdcl) jammu
Read moreSupply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at bhagata mohalla , damuni, under ed-i jammu
Supply, erection, testing, commissioning for creation of 63 kva sub-station alongwith laying of ht line on 9 mtr /8mtr st pole and laying of lt line on 8 mtr st pole at bhagata mohalla , damuni, under ed-i jammu
Read moreof your Industry type