Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvement Of Station Buildings And Service Buildings From Btp Abp &Amp Abp Td Section Under Aden/Jnu In The Jurisdiction Of Sr. Den Iii/Lko.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78525592 |
Reference Number |
37-Sr-DEN-III-LKO-2024-25 |
Tender Fee | 0 |
EMD | 1.9 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78525592/viewNitPdf_4776467.pdf |
Start Date | November 19, 2024 19:01 |
End Date |
16/12/2024 ( Expired 203 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRepairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreMaintenance of agartala town road during the year 2025 26 road portion near amtali police station under the jurisdiction of central iii sub division sh rcc, wbm paver blocks and other allied items
Maintenance of agartala town road during the year 2025 26 road portion near amtali police station under the jurisdiction of central iii sub division sh rcc, wbm paver blocks and other allied items
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line at rasul nagar 2nd line and bongarala beedu old vehicle shed road for avoid contamination of water and improvement of water supply in div no.53 and 55 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line at rasul nagar 2nd line and bongarala beedu old vehicle shed road for avoid contamination of water and improvement of water supply in div no.53 and 55 under ae-14 section.
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Read moreCs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).
Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).
Read moreof your Industry type