Tender Details
Particulars | Details |
---|---|
Title |
Laying Of Ms Pipe Up To 400 Mm. Dia. With Transportation Of Pipes, Fabrications, Installation Of Val
|
Description |
Laying Of Ms Pipe Up To 400 Mm. Dia. With Transportation Of Pipes, Fabrications, Installation Of Valves & Commissioning At Khursipara Zone Iii Rcc Overhead Water Tank In Bhilai Township.
|
Organisation | Steel Authority of India Ltd | Public Sector Undertakings |
Tender Id | 100963 |
Reference Number |
266/2024-25/DED-201/4 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Bhilai Steel Plant |
Link | https://sailtenders.co.in/Home/TendDetails?hTend=100963 |
Start Date | March 05, 2025 23:30 |
End Date |
17/03/2025 ( Expired 59 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Read moreRehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreRehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Read moreFurniture (workstation & chair) with table top for workstation made up of 25 mm thick pre-laminated
Read more
Procurement of structural steel for installation of platform with hand railing along the pipe rack of asdl from stage-ii pump house, capex 25-26.
Procurement of structural steel for installation of platform with hand railing along the pipe rack of asdl from stage-ii pump house, capex 25-26.
Read moreP and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
P and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
Read moreArc for work of construction and commissioning of 200 mm dia tube well with pljt of pipe line with 2 years of dlp under sub division behror under jurisdiction of executive engineer phed behror district kotputli-behror.
Arc for work of construction and commissioning of 200 mm dia tube well with pljt of pipe line with 2 years of dlp under sub division behror under jurisdiction of executive engineer phed behror district kotputli-behror.
Read moreof your Industry type