Tender Details

Particulars Details
Title
General Providing Bc Overlay And Bm Patches Between Km 0 000 34 200 Of Sulthan Bathery Pulpally Perikalloor Road Under Roads Section Pulpally In Wayanad District Providing Bc Overlay And Bm Patches Between Km 0 000 34 200 Of Sulthan Bathery Pulpall
Description
General Providing Bc Overlay And Bm Patches Between Km 0 000 34 200 Of Sulthan Bathery Pulpally Perikalloor Road Under Roads Section Pulpally In Wayanad District Providing Bc Overlay And Bm Patches Between Km 0 000 34 200 Of Sulthan Bathery Pulpall
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_763285_1
Reference
Number
PWD/RB/TR/21567/2024_5_1_1/1
Tender Fee 16540
EMD 5 Lakh
Tender Value
Place pulpally , wayanad
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1243109
Start Date May 05, 2025 22:30
End Date

17/05/2025 ( Expired 28 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Providing road safety measures at morth identified black spots locations based on accident data of 2017-19,2018-20 and 2019-21 from km.23.000 (near thukkuguda) to km.108.800 (dindi) of hyderabad -dindi section of nh-765 in the states of telangana

Providing road safety measures at morth identified black spots locations based on accident data of 2017-19,2018-20 and 2019-21 from km.23.000 (near thukkuguda) to km.108.800 (dindi) of hyderabad -dindi section of nh-765 in the states of telangana

Read more
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector

Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector

Read more
Maintenance work from km 0/000 to km 49/985 (length 49.985 km) dhar to gujri section section of nh-347c under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 0/000 to km 49/985 (length 49.985 km) dhar to gujri section section of nh-347c under short term maintenance contract in the state of madhya pradesh

Read more
Maintenance work from km 34/560 to km 36/000 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 34/560 to km 36/000 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Read more
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif

Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif

Read more
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Annual surfacing on link road to village khatnol km. 0/00 to 10/000

Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise