Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Feasibility Study And Preparing Detailed Project Report For The Packaged Tea Retail Business
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2023/B/3852112 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | August 21, 2023 17:14 |
| End Date |
Expired
31/08/2023
Expired 1119 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | CENTRE FOR STRATEGY AND LEADERSHIP | Make : NA Model : GEM/2023/B/3852112 Title : Feasibility study and preparing detailed project report for the packaged tea retail business (Q3) | 30-08-2023 15:49:57 | MSE | Qualified |
| 2 | SWICONS CONSULTANCY SERVICES PRIVATE LIMITED | Make : SWICONS Model : SWICONS Title : Feasibility Study | 29-08-2023 19:21:59 | N/A | Qualified |
Survey and preparing detailed project report (dpr)
Survey and preparing detailed project report (dpr) for installing cctv camara in main road and different wrad of nagar parishad sohagpur
Read moreEngaging technical consultant for preparation of feasibility study (fs) and detailed project report (dpr)
Engaging tech consult for rep of (fs) dpr) on epc mode for const rd sarli-phulle-wasi-dharmu-sangia (new alignment) from km 13.500 to km 40.00 (net 26.50 km) green field alignment to nhsl specifications the aor of 85 rcc under 756 tf p ank in a.p
Read moreFeasibility study and preparation of detailed project report for the proposed subways at 9 lcs.
For complete deion and other details, please refer to tender
Read morePreparing detailed project report for construction of water harvesting
Preparing detailed project report for construction of water harvesting&#x0d and storage structure at leh nallah for preparation of dprs of minor irrigation &#x0d
Read morePreparing detailed project report for irrigation canal gunesthang nimoo
Preparing detailed project report for irrigation canal gunesthang nimoo
Read morePreparing detailed project report for tyakshi phadathang irrigation canal.
Preparing detailed project report for tyakshi phadathang irrigation canal.
Read morePreparing detailed project report for main irrigation canal sumdha chenmo.
Preparing detailed project report for main irrigation canal sumdha chenmo.
Read moreFeasibility study report (fsr) and detailed project report (dpr) for construction of additional railway infrastructure required for rtps phii (2x660 mw)
Feasibility study report (fsr) and detailed project report (dpr) for construction of additional railway infrastructure required for rtps phii (2x660 mw)
Read moreConducting detailed feasibility study and preparation of detailed project report for setting up floating solar power plant at tnpl unit - i
Conducting detailed feasibility study and preparation of detailed project report for setting up floating solar power plant at tnpl unit - i
Read morePreparing detailed project report dpr for the development of ropeway projects
Preparing detailed project report dpr for the development of ropeway projects
Read moreof your Industry type